FINERACT-2081: Adding TestrailIds, removing Skip tags
This commit is contained in:
@@ -1278,36 +1278,6 @@ Feature: LoanCharge
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 3000 | 90 | 0.0 | 46.35 | 3136.35 | 0 | 0 | 0 | 3136.35 |
|
||||
|
||||
# TODO Create loan product suitable for LOAN_TRANCHE_DISBURSEMENT_PERCENTAGE_FEE, replace, fix expected results
|
||||
@Skip @TestRailId:C2677
|
||||
Scenario: FEE06 - Verify the loan creation with charge: tranche disbursement percentage fee, multi disbursement
|
||||
When Admin sets the business date to "01 January 2023"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP1_INTEREST_DECLINING_BALANCE_SAR_RECALCULATION_SAME_AS_REPAYMENT_COMPOUNDING_NONE_MULTI_DISBURSEMENT | 1 January 2023 | 3000 | 12 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 3 | MONTHS | 1 | MONTHS | 3 | 0 | 0 | 0 | PENALTIES_FEES_INTEREST_PRINCIPAL_ORDER |
|
||||
And Admin successfully approves the loan on "01 January 2023" with "3000" amount and expected disbursement date on "01 January 2023"
|
||||
When Admin successfully disburse the loan on "01 January 2023" with "1000" EUR transaction amount
|
||||
When Admin adds "LOAN_TRANCHE_DISBURSEMENT_PERCENTAGE_FEE" charge with 1.5 % of transaction amount
|
||||
When Admin sets the business date to "01 February 2023"
|
||||
When Admin successfully disburse the loan on "01 February 2023" with "1000" EUR transaction amount
|
||||
When Admin sets the business date to "01 March 2023"
|
||||
When Admin successfully disburse the loan on "01 March 2023" with "1000" EUR transaction amount
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2023 | Repayment (at time of disbursement) | 15.0 | 0.0 | 0.0 | 15.0 | 0.0 | 0.0 |
|
||||
| 01 January 2023 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Charges tab has the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| Disbursement percentage fee | false | Disbursement | | % Amount | 15.0 | 15.0 | 0.0 | 0.0 |
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2023 | | 1000.0 | | | 15.0 | | 15.0 | 15.0 | | | |
|
||||
| 1 | 30 | 31 January 2023 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000 | 0 | 15 | 0 | 1015 | 15 | 0 | 0 | 1000 |
|
||||
|
||||
@TestRailId:C2790
|
||||
Scenario: Verify that partially waived installment fee applied correctly in reverse-replay logic
|
||||
When Admin sets the business date to "01 January 2023"
|
||||
@@ -2257,16 +2227,16 @@ Feature: LoanCharge
|
||||
When Admin sets the business date to "27 September 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 27 Sep 2024 | 100 | 9.99 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 1 | MONTHS | 1 | MONTHS | 1 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "27 September 2024" with "40" amount and expected disbursement date on "27 September 2024"
|
||||
When Admin successfully disburse the loan on "27 September 2024" with "40" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 27 September 2024 | | 40.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 30 | 27 October 2024 | | 0.0 | 40.0 | 0.33 | 0.0 | 0.0 | 40.33 | 0.0 | 0.0 | 0.0 | 40.33 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 27 September 2024 | | 40.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 30 | 27 October 2024 | | 0.0 | 40.0 | 0.33 | 0.0 | 0.0 | 40.33 | 0.0 | 0.0 | 0.0 | 40.33 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 40.0 | 0.33 | 0.0 | 0.0 | 40.33 | 0.0 | 0.0 | 0.0 | 40.33 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
@@ -2275,12 +2245,12 @@ Feature: LoanCharge
|
||||
When Admin makes a charge adjustment for the last "LOAN_NSF_FEE" type charge which is due on "27 September 2024" with 1 EUR transaction amount and externalId ""
|
||||
Then Loan has 40.32 outstanding amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 27 September 2024 | | 40.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 30 | 27 October 2024 | | 0.0 | 40.0 | 0.32 | 0.0 | 1.0 | 41.32 | 1.0 | 1.0 | 0.0 | 40.32 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 27 September 2024 | | 40.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 30 | 27 October 2024 | | 0.0 | 40.0 | 0.32 | 0.0 | 1.0 | 41.32 | 1.0 | 1.0 | 0.0 | 40.32 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 40.0 | 0.32 | 0.0 | 1.0 | 41.32 | 1.0 | 1.0 | 0.0 | 40.32 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 40.0 | 0.32 | 0.0 | 1.0 | 41.32 | 1.0 | 1.0 | 0.0 | 40.32 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 27 September 2024 | Disbursement | 40.0 | 0.0 | 0.0 | 0.0 | 0.0 | 40.0 |
|
||||
@@ -2297,31 +2267,31 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
When Admin sets the business date to "05 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "05 February 2024" due date and 25 EUR transaction amount
|
||||
Then Loan Charges tab has the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 05 February 2024 | Flat | 25.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has 2 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 25.0 | 1030.83 | 0.0 | 0.0 | 0.0 | 1030.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Given Global configuration "enable-immediate-charge-accrual-post-maturity" is disabled
|
||||
Then LoanAccrualTransactionCreatedBusinessEvent is not raised on "05 February 2024"
|
||||
|
||||
@@ -2336,31 +2306,31 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
When Admin sets the business date to "05 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "05 February 2024" due date and 25 EUR transaction amount
|
||||
Then Loan Charges tab has the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 05 February 2024 | Flat | 25.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has 2 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 25.0 | 1025.0 | 0.0 | 0.0 | 0.0 | 1025.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 25.0 | 1025.0 | 0.0 | 0.0 | 0.0 | 1025.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Given Global configuration "enable-immediate-charge-accrual-post-maturity" is disabled
|
||||
Then LoanAccrualTransactionCreatedBusinessEvent is not raised on "05 February 2024"
|
||||
|
||||
@@ -2375,15 +2345,15 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
When Admin sets the business date to "05 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "05 February 2024" due date and 25 EUR transaction amount
|
||||
When Admin sets the business date to "06 February 2024"
|
||||
@@ -2392,17 +2362,17 @@ Feature: LoanCharge
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 05 February 2024 | Flat | 25.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has 2 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 25.0 | 1030.83 | 0.0 | 0.0 | 0.0 | 1030.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 30.83 | 0.0 | 5.83 | 0.0 | 25.0 | 0.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 30.83 | 0.0 | 5.83 | 0.0 | 25.0 | 0.0 |
|
||||
Then LoanAccrualTransactionCreatedBusinessEvent is raised on "05 February 2024"
|
||||
|
||||
@TestRailId:C3321
|
||||
@@ -2416,15 +2386,15 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
When Admin sets the business date to "05 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "05 February 2024" due date and 25 EUR transaction amount
|
||||
When Admin sets the business date to "06 February 2024"
|
||||
@@ -2433,17 +2403,17 @@ Feature: LoanCharge
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 05 February 2024 | Flat | 25.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has 2 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 25.0 | 1025.0 | 0.0 | 0.0 | 0.0 | 1025.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 25.0 | 1025.0 | 0.0 | 0.0 | 0.0 | 1025.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 0.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 0.0 |
|
||||
Then LoanAccrualTransactionCreatedBusinessEvent is raised on "05 February 2024"
|
||||
|
||||
@TestRailId:C3336
|
||||
@@ -2457,15 +2427,15 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 1 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
When Admin sets the business date to "05 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "05 February 2024" due date and 25 EUR transaction amount
|
||||
When Admin sets the business date to "06 February 2024"
|
||||
@@ -2474,17 +2444,17 @@ Feature: LoanCharge
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 05 February 2024 | Flat | 25.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has 2 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 0.0 | 1000.0 | 5.83 | 0.0 | 0.0 | 1005.83 | 0.0 | 0.0 | 0.0 | 1005.83 |
|
||||
| 2 | 4 | 05 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 5.83 | 0.0 | 25.0 | 1030.83 | 0.0 | 0.0 | 0.0 | 1030.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 30.83 | 0.0 | 5.83 | 0.0 | 25.0 | 0.0 |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
| 05 February 2024 | Accrual | 30.83 | 0.0 | 5.83 | 0.0 | 25.0 | 0.0 |
|
||||
Given Global configuration "enable-immediate-charge-accrual-post-maturity" is disabled
|
||||
Then LoanAccrualTransactionCreatedBusinessEvent is raised on "05 February 2024"
|
||||
|
||||
@@ -2498,27 +2468,27 @@ Feature: LoanCharge
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
When Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 75.21 | 24.79 | 0.58 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 2 | 29 | 01 March 2024 | | 50.28 | 24.93 | 0.44 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 3 | 31 | 01 April 2024 | | 25.2 | 25.08 | 0.29 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 25.2 | 0.15 | 0.0 | 0.0 | 25.35 | 0.0 | 0.0 | 0.0 | 25.35 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 75.21 | 24.79 | 0.58 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 2 | 29 | 01 March 2024 | | 50.28 | 24.93 | 0.44 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 3 | 31 | 01 April 2024 | | 25.2 | 25.08 | 0.29 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 25.2 | 0.15 | 0.0 | 0.0 | 25.35 | 0.0 | 0.0 | 0.0 | 25.35 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 1.46 | 0.0 | 0.0 | 101.46 | 0.0 | 0.0 | 0.0 |101.46 |
|
||||
| 100 | 1.46 | 0.0 | 0.0 | 101.46 | 0.0 | 0.0 | 0.0 | 101.46 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "01 February 2024" due date and 20 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 75.21 | 24.79 | 0.58 | 0.0 | 20.0 | 45.37 | 0.0 | 0.0 | 0.0 | 45.37 |
|
||||
| 2 | 29 | 01 March 2024 | | 50.28 | 24.93 | 0.44 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 3 | 31 | 01 April 2024 | | 25.2 | 25.08 | 0.29 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 25.2 | 0.15 | 0.0 | 0.0 | 25.35 | 0.0 | 0.0 | 0.0 | 25.35 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 75.21 | 24.79 | 0.58 | 0.0 | 20.0 | 45.37 | 0.0 | 0.0 | 0.0 | 45.37 |
|
||||
| 2 | 29 | 01 March 2024 | | 50.28 | 24.93 | 0.44 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 3 | 31 | 01 April 2024 | | 25.2 | 25.08 | 0.29 | 0.0 | 0.0 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 25.2 | 0.15 | 0.0 | 0.0 | 25.35 | 0.0 | 0.0 | 0.0 | 25.35 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 1.46 | 0.0 | 20.0 | 121.46 | 0.0 | 0.0 | 0.0 | 121.46 |
|
||||
@@ -2527,37 +2497,37 @@ Feature: LoanCharge
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 |
|
||||
Then Loan Charges tab has a given charge with the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 01 February 2024 | Flat | 20.0 | 0.0 | 0.0 | 20.0 |
|
||||
| NSF fee | true | Specified due date | 01 February 2024 | Flat | 20.0 | 0.0 | 0.0 | 20.0 |
|
||||
# --- Backdated repayment with 60 EUR ---
|
||||
And Customer makes "AUTOPAY" repayment on "01 January 2024" with 60 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 74.63 | 25.37 | 0.0 | 0.0 | 20.0 | 45.37 | 25.37 | 25.37 | 0.0 | 20.0 |
|
||||
| 2 | 29 | 01 March 2024 | 01 January 2024 | 49.26 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 | 25.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 24.58 | 24.68 | 0.69 | 0.0 | 0.0 | 25.37 | 9.26 | 9.26 | 0.0 | 16.11 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 24.58 | 0.14 | 0.0 | 0.0 | 24.72 | 0.0 | 0.0 | 0.0 | 24.72 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 74.63 | 25.37 | 0.0 | 0.0 | 20.0 | 45.37 | 25.37 | 25.37 | 0.0 | 20.0 |
|
||||
| 2 | 29 | 01 March 2024 | 01 January 2024 | 49.26 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 | 25.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 24.58 | 24.68 | 0.69 | 0.0 | 0.0 | 25.37 | 9.26 | 9.26 | 0.0 | 16.11 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 24.58 | 0.14 | 0.0 | 0.0 | 24.72 | 0.0 | 0.0 | 0.0 | 24.72 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 0.83 | 0.0 | 20.0 | 120.83 | 60.0 | 60.0 | 0.0 | 60.83 |
|
||||
| 100 | 0.83 | 0.0 | 20.0 | 120.83 | 60.0 | 60.0 | 0.0 | 60.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 |
|
||||
| 01 January 2024 | Repayment | 60.0 | 60.0 | 0.0 | 0.0 | 0.0 | 40.0 |
|
||||
Then Loan Charges tab has a given charge with the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| NSF fee | true | Specified due date | 01 February 2024 | Flat | 20.0 | 0.0 | 0.0 | 20.0 |
|
||||
| NSF fee | true | Specified due date | 01 February 2024 | Flat | 20.0 | 0.0 | 0.0 | 20.0 |
|
||||
When Admin makes a charge adjustment for the last "LOAN_NSF_FEE" type charge which is due on "01 February 2024" with 20 EUR transaction amount and externalId ""
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 74.63 | 25.37 | 0.0 | 0.0 | 20.0 | 45.37 | 45.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 01 January 2024 | 49.26 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 | 25.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 24.58 | 24.68 | 0.69 | 0.0 | 0.0 | 25.37 | 9.26 | 9.26 | 0.0 | 16.11 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 24.58 | 0.14 | 0.0 | 0.0 | 24.72 | 0.0 | 0.0 | 0.0 | 24.72 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 74.63 | 25.37 | 0.0 | 0.0 | 20.0 | 45.37 | 45.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 01 January 2024 | 49.26 | 25.37 | 0.0 | 0.0 | 0.0 | 25.37 | 25.37 | 25.37 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 24.58 | 24.68 | 0.69 | 0.0 | 0.0 | 25.37 | 9.26 | 9.26 | 0.0 | 16.11 |
|
||||
| 4 | 30 | 01 May 2024 | | 0.0 | 24.58 | 0.14 | 0.0 | 0.0 | 24.72 | 0.0 | 0.0 | 0.0 | 24.72 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 0.83 | 0.0 | 20.0 | 120.83 | 80.0 | 60.0 | 0.0 | 40.83 |
|
||||
| 100 | 0.83 | 0.0 | 20.0 | 120.83 | 80.0 | 60.0 | 0.0 | 40.83 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 |
|
||||
|
||||
Reference in New Issue