FINERACT-2413: Re-amortization reverse replay handling

This commit is contained in:
Oleksii Novikov
2025-12-18 12:37:52 +01:00
committed by Adam Saghy
parent e8e9fb139d
commit 630f41f11f
8 changed files with 208 additions and 178 deletions
@@ -179,6 +179,7 @@ public enum DefaultLoanProduct implements LoanProduct {
LP1_INTEREST_FLAT_DAILY_RECALCULATION_SAR_MULTIDISB_EXPECT_TRANCHES, //
LP1_INTEREST_FLAT_DAILY_ACTUAL_ACTUAL_MULTIDISB_EXPECT_TRANCHES, //
LP2_ADV_PYMNT_360_30_ZERO_INTEREST_CHARGE_OFF_ACCRUAL_ACTIVITY, //
LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL_PRINCIPAL_FIRST, //
;
@Override
@@ -4229,6 +4229,39 @@ public class LoanProductGlobalInitializerStep implements FineractGlobalInitializ
TestContext.INSTANCE.set(
TestContextKey.DEFAULT_LOAN_PRODUCT_CREATE_RESPONSE_LP2_ADV_PYMNT_INTEREST_DAILY_EMI_360_30_INTEREST_RECALC_DAILY_MULTIDISBURSE_CHARGEBACK,
responseLoanProductsRequestLP2AdvancedpaymentInterestEmi36030InterestRecalcDailyMultiDisburseChargeback);
// LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL_PRINCIPAL_FIRST
// Same as LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL but with PRINCIPAL before INTEREST
// in payment allocation order
String name168 = DefaultLoanProduct.LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL_PRINCIPAL_FIRST.getName();
PostLoanProductsRequest loanProductsRequestAdvCustomPaymentAllocationProgressiveLoanSchedulePrincipalFirst = loanProductsRequestFactory
.defaultLoanProductsRequestLP2InterestDailyRecalculation()//
.name(name168)//
.supportedInterestRefundTypes(Arrays.asList("MERCHANT_ISSUED_REFUND", "PAYOUT_REFUND"))//
.enableAccrualActivityPosting(true) //
.paymentAllocation(List.of(//
createPaymentAllocation("DEFAULT", "NEXT_INSTALLMENT",
LoanProductPaymentAllocationRule.AllocationTypesEnum.PAST_DUE_PRINCIPAL, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.PAST_DUE_INTEREST, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.PAST_DUE_PENALTY, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.PAST_DUE_FEE, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.DUE_PRINCIPAL, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.DUE_INTEREST, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.DUE_PENALTY, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.DUE_FEE, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.IN_ADVANCE_PRINCIPAL, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.IN_ADVANCE_INTEREST, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.IN_ADVANCE_PENALTY, //
LoanProductPaymentAllocationRule.AllocationTypesEnum.IN_ADVANCE_FEE), //
createPaymentAllocation("GOODWILL_CREDIT", "REAMORTIZATION"), //
createPaymentAllocation("MERCHANT_ISSUED_REFUND", "LAST_INSTALLMENT"), //
createPaymentAllocation("PAYOUT_REFUND", "NEXT_INSTALLMENT")));//
PostLoanProductsResponse responseLoanProductsRequestAdvCustomPaymentAllocationProgressiveLoanSchedulePrincipalFirst = createLoanProductIdempotent(
loanProductsRequestAdvCustomPaymentAllocationProgressiveLoanSchedulePrincipalFirst);
TestContext.INSTANCE.set(
TestContextKey.DEFAULT_LOAN_PRODUCT_CREATE_RESPONSE_LP2_ADVANCED_CUSTOM_PAYMENT_ALLOCATION_PROGRESSIVE_LOAN_SCHEDULE_PRINCIPAL_FIRST,
responseLoanProductsRequestAdvCustomPaymentAllocationProgressiveLoanSchedulePrincipalFirst);
}
public static AdvancedPaymentData createPaymentAllocation(String transactionType, String futureInstallmentAllocationRule,
@@ -56,7 +56,7 @@ public class LoanReAmortizationStepDef extends AbstractStepDef {
private final FineractFeignClient fineractClient;
private final EventAssertion eventAssertion;
@When("When Admin creates a Loan re-amortization transaction on current business date")
@When("Admin creates a Loan re-amortization transaction on current business date")
public void createLoanReAmortization() {
PostLoansResponse loanResponse = testContext().get(TestContextKey.LOAN_CREATE_RESPONSE);
long loanId = loanResponse.getLoanId();
@@ -68,18 +68,6 @@ public class LoanReAmortizationStepDef extends AbstractStepDef {
testContext().set(TestContextKey.LOAN_REAMORTIZATION_RESPONSE, response);
}
@When("Admin creates a Loan re-amortization transaction on {string} date")
public void createLoanReAmortization(final String date) {
PostLoansResponse loanResponse = testContext().get(TestContextKey.LOAN_CREATE_RESPONSE);
long loanId = loanResponse.getLoanId();
PostLoansLoanIdTransactionsRequest reAmortizationRequest = LoanRequestFactory.defaultLoanReAmortizationRequest().startDate(date);
PostLoansLoanIdTransactionsResponse response = ok(() -> fineractClient.loanTransactions().executeLoanTransaction(loanId,
reAmortizationRequest, Map.of("command", "reAmortize")));
testContext().set(TestContextKey.LOAN_REAMORTIZATION_RESPONSE, response);
}
@When("Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling {string}")
public void createLoanReAmortizationWithInterestHandling(final String reAmortizationInterestHandling) {
final PostLoansResponse loanResponse = testContext().get(TestContextKey.LOAN_CREATE_RESPONSE);
@@ -93,20 +81,7 @@ public class LoanReAmortizationStepDef extends AbstractStepDef {
testContext().set(TestContextKey.LOAN_REAMORTIZATION_RESPONSE, response);
}
@When("Admin creates a Loan re-amortization transaction on {string} date with reAmortizationInterestHandling {string}")
public void createLoanReAmortizationWithInterestHandling(final String date, final String reAmortizationInterestHandling) {
final PostLoansResponse loanResponse = testContext().get(TestContextKey.LOAN_CREATE_RESPONSE);
final Long loanId = loanResponse.getLoanId();
final PostLoansLoanIdTransactionsRequest reAmortizationRequest = LoanRequestFactory.defaultLoanReAmortizationRequest()
.reAmortizationInterestHandling(reAmortizationInterestHandling).startDate(date);
final PostLoansLoanIdTransactionsResponse response = ok(() -> fineractClient.loanTransactions().executeLoanTransaction(loanId,
reAmortizationRequest, Map.of("command", "reAmortize")));
testContext().set(TestContextKey.LOAN_REAMORTIZATION_RESPONSE, response);
}
@When("When Admin creates a Loan re-amortization transaction on current business date by loan external ID")
@When("Admin creates a Loan re-amortization transaction on current business date by loan external ID")
public void createLoanReAmortizationByLoanExternalId() {
PostLoansResponse loanResponse = testContext().get(TestContextKey.LOAN_CREATE_RESPONSE);
String loanExternalId = loanResponse.getResourceExternalId();
@@ -291,4 +291,5 @@ public abstract class TestContextKey {
public static final String LP1_INTEREST_FLAT_DAILY_RECALCULATION_SAR_MULTIDISB_EXPECT_TRANCHES = "loanProductCreateResponseLP1InterestFlatDailyRecalculationSameAsRepaymentMultiDisbursementExpectTranches";
public static final String LP1_INTEREST_FLAT_DAILY_ACTUAL_ACTUAL_MULTIDISB_EXPECT_TRANCHES = "loanProductCreateResponseLP1InterestFlatDailyActualActualMultiDisbursementExpectTranches";
public static final String DEFAULT_LOAN_PRODUCT_CREATE_RESPONSE_LP2_ADV_PYMNT_360_30_ZERO_INTEREST_CHARGE_OFF_ACCRUAL_ACTIVITY = "loanProductCreateResponseLP2AdvancedPaymentZeroInterestChargeOffBehaviourAccrualActivity";
public static final String DEFAULT_LOAN_PRODUCT_CREATE_RESPONSE_LP2_ADVANCED_CUSTOM_PAYMENT_ALLOCATION_PROGRESSIVE_LOAN_SCHEDULE_PRINCIPAL_FIRST = "loanProductCreateResponseLP2AdvancedPaymentHorizontalPrincipalFirst";
}
@@ -26,7 +26,7 @@ Feature: LoanReAmortization
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -68,7 +68,7 @@ Feature: LoanReAmortization
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
When When Admin creates a Loan re-amortization transaction on current business date by loan external ID
When Admin creates a Loan re-amortization transaction on current business date by loan external ID
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -96,7 +96,7 @@ Feature: LoanReAmortization
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -145,7 +145,7 @@ Feature: LoanReAmortization
When Admin runs inline COB job for Loan
Then Admin checks that delinquency range is: "RANGE_3" and has delinquentDate "2024-01-19"
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Admin checks that delinquency range is: "NO_DELINQUENCY" and has delinquentDate ""
@TestRailId:C3073 @AdvancedPaymentAllocation
@@ -161,7 +161,7 @@ Feature: LoanReAmortization
When Admin sets the business date to "16 January 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "16 January 2024" due date and 10 EUR transaction amount
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -189,7 +189,7 @@ Feature: LoanReAmortization
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -217,7 +217,7 @@ Feature: LoanReAmortization
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -264,7 +264,7 @@ Feature: LoanReAmortization
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "27 February 2024" due date and 10 EUR transaction amount
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 5 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -295,7 +295,7 @@ Feature: LoanReAmortization
When Admin sets the business date to "16 January 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "16 January 2024" due date and 10 EUR transaction amount
When Admin sets the business date to "31 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -340,7 +340,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 17 January 2024 | Repayment | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 | 325.0 |
When Admin sets the business date to "30 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date by loan external ID
When Admin creates a Loan re-amortization transaction on current business date by loan external ID
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -372,7 +372,7 @@ Feature: LoanReAmortization
When Admin runs inline COB job for Loan
Then LoanDelinquencyRangeChangeBusinessEvent is created
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then LoanDelinquencyRangeChangeBusinessEvent is created
Then LoanReAmortizeBusinessEvent is created
@@ -390,7 +390,7 @@ Feature: LoanReAmortization
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 120 EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -443,7 +443,7 @@ Feature: LoanReAmortization
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -495,7 +495,7 @@ Feature: LoanReAmortization
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -552,7 +552,7 @@ Feature: LoanReAmortization
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 140 EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -605,7 +605,7 @@ Feature: LoanReAmortization
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction after 1st installment date ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -739,7 +739,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -809,7 +809,7 @@ Feature: LoanReAmortization
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
| Snooze fee | false | Specified due date | 15 February 2024 | Flat | 10.0 | 0.0 | 0.0 | 10.0 |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -880,7 +880,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -948,7 +948,7 @@ Feature: LoanReAmortization
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
| 01 February 2024 | Chargeback | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1015,7 +1015,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1085,7 +1085,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1510,15 +1510,14 @@ Feature: LoanReAmortization
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
| 15 March 2024 | Re-amortize | 12.76 | 12.39 | 0.37 | 0.0 | 0.0 | 0.0 | false | false |
@Skip
@TestRailId:C4374 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization trn reversed by backdated repayment - Interest calculation: Default Behavior - UC7
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
@@ -1540,6 +1539,27 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 March 2024" with 17.01 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
@@ -1551,7 +1571,7 @@ Feature: LoanReAmortization
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 34.02 | 0.0 | 0.0 | 68.03 |
Then Loan Transactions tab has the following data:
@@ -1559,31 +1579,9 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 67.05 | false | false |
# --- Re-amortization transaction ---
When Admin creates a Loan re-amortization transaction on "15 March 2024" date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 01 March 2024 | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 34.02 | 0.0 | 0.0 | 68.03 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 67.05 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@Skip
@TestRailId:C4375 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization trn reverse-replayed by backdated repayment - Interest calculation: equal amortization interest split - UC7
When Admin sets the business date to "01 January 2024"
@@ -1600,18 +1598,39 @@ Feature: LoanReAmortization
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 66.97 | 16.6 | 0.41 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.35 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.63 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.82 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.82 | 0.1 | 0.0 | 0.0 | 16.92 | 0.0 | 0.0 | 0.0 | 16.92 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.97 | 0.0 | 0.0 | 101.97 | 17.01 | 0.0 | 0.0 | 71.97 |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.08 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.08 | 0.24 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.29 | 0.0 | 0.0 | 102.29 | 17.01 | 0.0 | 0.0 | 85.28 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 March 2024" with 17.01 EUR transaction amount
@@ -1633,38 +1652,16 @@ Feature: LoanReAmortization
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 67.05 | false | false |
# --- Re-amortization transaction ---
And Admin creates a Loan re-amortization transaction on "15 March 2024" date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 01 March 2024 | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 34.02 | 0.0 | 0.0 | 68.03 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
| 15 March 2024 | Re-amortize | 4.02 | 3.61 | 0.41 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@Skip
@TestRailId:C4376 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization trn reverse-replayed by backdated repayment - Interest calculation: Default Behavior - UC7.1
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL_PRINCIPAL_FIRST | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
@@ -1678,7 +1675,7 @@ Feature: LoanReAmortization
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
Then Loan Transactions tab has the following data:
@@ -1686,58 +1683,58 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 March 2024" with 10 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 10.0 | 0.0 | 0.0 | 7.01 |
| 3 | 31 | 01 April 2024 | | 50.47 | 16.58 | 0.43 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.75 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.94 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
And Loan Repayment schedule has the following data in Total row:
| 2 | 29 | 01 March 2024 | 15 March 2024 | 73.57 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 55.7 | 17.87 | 0.92 | 0.0 | 0.0 | 18.79 | 0.0 | 0.0 | 0.0 | 18.79 |
| 4 | 30 | 01 May 2024 | | 37.23 | 18.47 | 0.32 | 0.0 | 0.0 | 18.79 | 0.0 | 0.0 | 0.0 | 18.79 |
| 5 | 31 | 01 June 2024 | | 18.66 | 18.57 | 0.22 | 0.0 | 0.0 | 18.79 | 0.0 | 0.0 | 0.0 | 18.79 |
| 6 | 30 | 01 July 2024 | | 0.0 | 18.66 | 0.11 | 0.0 | 0.0 | 18.77 | 0.0 | 0.0 | 0.0 | 18.77 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.09 | 0.0 | 0.0 | 102.09 | 27.01 | 0.0 | 0.0 | 75.08 |
| 100.0 | 2.15 | 0.0 | 0.0 | 102.15 | 27.01 | 0.0 | 0.0 | 75.14 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 10.0 | 9.51 | 0.49 | 0.0 | 0.0 | 74.06 | false | false |
# --- Re-amortization transaction ---
When Admin creates a Loan re-amortization transaction on "15 March 2024" date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 10.0 | 0.0 | 0.0 | 7.01 |
| 3 | 31 | 01 April 2024 | | 50.47 | 16.58 | 0.43 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.75 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.94 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.09 | 0.0 | 0.0 | 102.09 | 27.01 | 0.0 | 0.0 | 75.08 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 10.0 | 9.51 | 0.49 | 0.0 | 0.0 | 74.06 | false | false |
| 15 March 2024 | Re-amortize | 7.01 | 6.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
| 01 March 2024 | Repayment | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 | 73.57 | false | false |
| 15 March 2024 | Re-amortize | 7.01 | 6.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | true |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@Skip
@TestRailId:C4377
Scenario: Verify Re-amortization trn reversed by backdated repayment - Interest calculation: equal amortization interest split - UC7.1
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL_PRINCIPAL_FIRST | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
@@ -1746,18 +1743,39 @@ Feature: LoanReAmortization
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 66.97 | 16.6 | 0.41 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.35 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.63 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.82 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.82 | 0.1 | 0.0 | 0.0 | 16.92 | 0.0 | 0.0 | 0.0 | 16.92 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.97 | 0.0 | 0.0 | 101.97 | 17.01 | 0.0 | 0.0 | 71.97 |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.08 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.08 | 0.24 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.29 | 0.0 | 0.0 | 102.29 | 17.01 | 0.0 | 0.0 | 85.28 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 March 2024" with 10 EUR transaction amount
@@ -1765,40 +1783,20 @@ Feature: LoanReAmortization
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 10.0 | 0.0 | 0.0 | 7.01 |
| 3 | 31 | 01 April 2024 | | 50.47 | 16.58 | 0.43 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.75 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.94 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 73.57 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 55.34 | 18.23 | 0.55 | 0.0 | 0.0 | 18.78 | 0.0 | 0.0 | 0.0 | 18.78 |
| 4 | 30 | 01 May 2024 | | 37.0 | 18.34 | 0.44 | 0.0 | 0.0 | 18.78 | 0.0 | 0.0 | 0.0 | 18.78 |
| 5 | 31 | 01 June 2024 | | 18.56 | 18.44 | 0.34 | 0.0 | 0.0 | 18.78 | 0.0 | 0.0 | 0.0 | 18.78 |
| 6 | 30 | 01 July 2024 | | 0.0 | 18.56 | 0.23 | 0.0 | 0.0 | 18.79 | 0.0 | 0.0 | 0.0 | 18.79 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.09 | 0.0 | 0.0 | 102.09 | 27.01 | 0.0 | 0.0 | 75.08 |
| 100.0 | 2.14 | 0.0 | 0.0 | 102.14 | 27.01 | 0.0 | 0.0 | 75.13 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 10.0 | 9.51 | 0.49 | 0.0 | 0.0 | 74.06 | false | false |
# --- Re-amortization transaction ---
And Admin creates a Loan re-amortization transaction on "15 March 2024" date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 10.0 | 0.0 | 0.0 | 7.01 |
| 3 | 31 | 01 April 2024 | | 50.47 | 16.58 | 0.43 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.75 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.94 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.09 | 0.0 | 0.0 | 102.09 | 27.01 | 0.0 | 0.0 | 75.08 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 March 2024 | Repayment | 10.0 | 9.51 | 0.49 | 0.0 | 0.0 | 74.06 | false | false |
| 15 March 2024 | Re-amortize | 7.01 | 6.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
| 01 March 2024 | Repayment | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 | 73.57 | false | false |
| 15 March 2024 | Re-amortize | 7.01 | 6.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | true |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@@ -1817,7 +1815,7 @@ Feature: LoanReAmortization
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1838,7 +1836,7 @@ Feature: LoanReAmortization
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 April 2024" with 21.32 EUR transaction amount
When Admin sets the business date to "15 May 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1890,7 +1888,7 @@ Feature: LoanReAmortization
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.08 | 5.0 | 10.0 | 117.08 | 17.01 | 0.0 | 0.0 | 100.07 |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1934,7 +1932,7 @@ Feature: LoanReAmortization
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
When Admin sets the business date to "15 April 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -1984,7 +1982,7 @@ Feature: LoanReAmortization
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
@@ -323,6 +323,9 @@ public class LoanTransaction extends AbstractAuditableWithUTCDateTimeCustom<Long
if (LoanTransactionType.REAGE.equals(loanTransaction.getTypeOf())) {
newTransaction.setLoanReAgeParameter(loanTransaction.getLoanReAgeParameter().getCopy(newTransaction));
}
if (LoanTransactionType.REAMORTIZE.equals(loanTransaction.getTypeOf())) {
newTransaction.setLoanReAmortizationParameter(loanTransaction.getLoanReAmortizationParameter().getCopy(newTransaction));
}
newTransaction.setClassification(loanTransaction.getClassification());
return newTransaction;
}
@@ -52,4 +52,8 @@ public class LoanReAmortizationParameter extends AbstractAuditableWithUTCDateTim
// for JPA, don't use
protected LoanReAmortizationParameter() {}
public LoanReAmortizationParameter getCopy(LoanTransaction loanTransaction) {
return new LoanReAmortizationParameter(loanTransaction, interestHandlingType, reamortizationReason);
}
}
@@ -643,6 +643,11 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
loanTransaction.updateComponentsAndTotal(totalOverDuePrincipal, totalOverDueInterest, Money.zero(currency),
Money.zero(currency));
if (totalOverDuePrincipal.isZero() && totalOverDueInterest.isZero() && loanTransaction.isNotReversed()) {
loanTransaction.reverse();
return;
}
emiCalculator.updateModelRepaymentPeriodsDuringReAmortizationWithEqualInterestSplit(progressiveTransactionCtx.getModel(),
transactionDate);
updateInstallmentsByRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
@@ -720,6 +725,11 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
Money.zero(transactionCtx.getCurrency()), Money.zero(transactionCtx.getCurrency()),
Money.zero(transactionCtx.getCurrency()));
if (MathUtil.isEqualTo(overallOverDuePrincipal, ZERO) && loanTransaction.isNotReversed()) {
loanTransaction.reverse();
return;
}
LoanRepaymentScheduleInstallment lastFutureInstallment = futureInstallments.stream()
.max(Comparator.comparing(LoanRepaymentScheduleInstallment::getDueDate)).get();
BigDecimal reAmortizationAmountPerInstallment = overallOverDuePrincipal.divide(BigDecimal.valueOf(futureInstallments.size()),
@@ -762,6 +772,11 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
loanTransaction.resetDerivedComponents();
loanTransaction.updateComponentsAndTotal(totalOverDuePrincipal, totalOverDueInterest, Money.zero(currency), Money.zero(currency));
if (totalOverDuePrincipal.isZero() && totalOverDueInterest.isZero() && loanTransaction.isNotReversed()) {
loanTransaction.reverse();
return;
}
// Update the existing model with re-amortized periods
emiCalculator.updateModelRepaymentPeriodsDuringReAmortization(ctx.getModel(), transactionDate);
updateInstallmentsByRepaymentPeriods(loanTransaction, ctx);