FINERACT-2205: Add tests when charge is added after the charge off date and forbid backdated charge-off transactions in the middle of the monetary activity.
This commit is contained in:
committed by
Adam Saghy
parent
bc0293bfa1
commit
69317d62c8
@@ -1757,7 +1757,7 @@ Feature: Charge-off
|
||||
| 15 July 2023 | Charge-off | 103.48 | 100.0 | 3.48 | 0.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added before the charge-off date, loan behaviour is zero-interest and interestRecalculation = true
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan with interest recalculation and date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -1775,6 +1775,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "27 February 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -1794,7 +1795,7 @@ Feature: Charge-off
|
||||
| 28 February 2023 | Charge-off | 104.14 | 100.0 | 1.14 | 3.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added on charge-off date, loan behaviour is zero-interest and interestRecalculation = true
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan with interest recalculation and date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -1812,6 +1813,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "28 February 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -1831,7 +1833,7 @@ Feature: Charge-off
|
||||
| 28 February 2023 | Charge-off | 104.14 | 100.0 | 1.14 | 3.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added after the charge off date, loan behaviour is zero-interest and interestRecalculation = true
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan with interest recalculation and date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -1849,6 +1851,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "1 March 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -1865,7 +1868,7 @@ Feature: Charge-off
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
|
||||
| 01 January 2023 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 |
|
||||
| 28 February 2023 | Charge-off | 101.14 | 100.0 | 1.14 | 0.0 | 0.0 | 0.0 |
|
||||
| 28 February 2023 | Charge-off | 104.14 | 100.0 | 1.14 | 3.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Undo the charge-off when loan behaviour is zero-interest and interestRecalculation = true
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
@@ -2316,6 +2319,313 @@ Feature: Charge-off
|
||||
| 29 February 2024 | Charge-off | 83.99 | 82.99 | 1.0 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
And Admin set "LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALCULATION_ZERO_INTEREST_CHARGE_OFF_BEHAVIOUR" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
|
||||
@scenario_9.3_interest_recalculation_enabled_after_3349
|
||||
Scenario: Verify error when backdated charge-off happened with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
And Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALCULATION_ZERO_INTEREST_CHARGE_OFF_BEHAVIOUR | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 0 | 0 | 102.05 | 0 | 0 | 0 | 102.05 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.01 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 5.0 | 0.0 | 22.01 | 22.01| 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 5.0 | 0 | 107.05 | 22.01| 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
And Admin tries to charge-off the loan on "29 February 2024" but fails due to monetary activity after the charge-off date
|
||||
|
||||
@scenario_9.3_interest_recalculation_enabled_after_3349
|
||||
Scenario: Charge-off with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
And Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALCULATION_ZERO_INTEREST_CHARGE_OFF_BEHAVIOUR | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 0 | 0 | 102.05 | 0 | 0 | 0 | 102.05 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.01 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 5.0 | 0.0 | 22.01 | 22.01| 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 5.0 | 0 | 107.05 | 22.01| 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
And Admin does charge-off the loan on "01 March 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 5.0 | 0.0 | 22.01 | 22.01| 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.04 | 17.01 | 0.0 | 3.0 | 0.0 | 20.01 | 0.0 | 0.0 | 0.0 | 0.0 | 20.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.03 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.02 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.02 | 0.0 | 0.0 | 0.0 | 16.02 | 0.0 | 0.0 | 0.0 | 0.0 | 16.02 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| 100 | 1.07 | 8.0 | 0 | 109.07 | 22.01| 0 | 0 | 0.0 | 87.06 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 22.01 | 16.43 | 0.58 | 5.0 | 0.0 | 83.57 | false | false |
|
||||
| 01 March 2024 | Charge-off | 87.06 | 83.57 | 0.49 | 3.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
@TestRailId:3349
|
||||
Scenario: Charge-off with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation, when charge is waived
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
And Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALCULATION_ZERO_INTEREST_CHARGE_OFF_BEHAVIOUR | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 0 | 0 | 102.05 | 0 | 0 | 0 | 102.05 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.01 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 5.0 | 0.0 | 22.01 | 22.01| 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.05 | 5.0 | 0 | 107.05 | 22.01| 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
And Admin does charge-off the loan on "01 March 2024"
|
||||
And Admin waives charge
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 5.0 | 0.0 | 22.01 | 22.01| 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.04 | 17.01 | 0.0 | 3.0 | 0.0 | 20.01 | 0.0 | 0.0 | 0.0 | 3.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.03 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.02 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.02 | 0.0 | 0.0 | 0.0 | 16.02 | 0.0 | 0.0 | 0.0 | 0.0 | 16.02 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| 100 | 1.07 | 8.0 | 0 | 109.07 | 22.01| 0 | 0 | 3.0 | 84.06 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 22.01 | 16.43 | 0.58 | 5.0 | 0.0 | 83.57 | false | false |
|
||||
| 01 March 2024 | Waive loan charges| 3.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 01 March 2024 | Charge-off | 84.06 | 83.57 | 0.49 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
@scenario_9.3_interest_recalculation_disabled_after_3373
|
||||
Scenario: Verify error when backdated charge-off happened with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation disabled
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.59 | 16.41 | 0.59 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 0 | 0 | 102.04 | 0 | 0 | 0 | 102.04 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.0 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 5.0 | 0.0 | 22.0 | 22.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 5 | 0 | 107.04 | 22.0 | 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
And Admin tries to charge-off the loan on "29 February 2024" but fails due to monetary activity after the charge-off date
|
||||
|
||||
@scenario_9.3_interest_recalculation_disabled_after_3373
|
||||
Scenario: Charge-off with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation disabled
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.59 | 16.41 | 0.59 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 0 | 0 | 102.04 | 0 | 0 | 0 | 102.04 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.0 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 5.0 | 0.0 | 22.0 | 22.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 5 | 0 | 107.04 | 22.0 | 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
And Admin does charge-off the loan on "01 March 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 5.0 | 0.0 | 22.0 | 22.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.05 | 17.0 | 0.0 | 3.0 | 0.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.05 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.05 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.05 | 0.0 | 0.0 | 0.0 | 16.05 | 0.0 | 0.0 | 0.0 | 16.05 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 1.05 | 8 | 0 | 109.05 | 22.0 | 0 | 0 | 87.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 22.0 | 16.41 | 0.59 | 5.0 | 0.0 | 83.59 | false | false |
|
||||
| 01 March 2024 | Charge-off | 87.05 | 83.59 | 0.46 | 3.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
@TestRailId:3373
|
||||
Scenario: Charge-off with charge is added after the charge off date when loan behavior is zero-interest with interestRecalculation disabled, when charge is waived
|
||||
When Admin sets the business date to "1 January 2024"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | | | | 0.0 |
|
||||
| 1 | 31 | 01 February 2024 | | 83.59 | 16.41 | 0.59 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 0 | 0 | 102.04 | 0 | 0 | 0 | 102.04 |
|
||||
And Admin successfully approves the loan on "1 January 2024" with "100" amount and expected disbursement date on "1 January 2024"
|
||||
And Admin successfully disburse the loan on "1 January 2024" with "100" EUR transaction amount
|
||||
When Admin sets the business date to "1 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "01 February 2024" due date and 5 EUR transaction amount
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 22.0 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 5.0 | 0.0 | 22.0 | 22.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.45 | 16.6 | 0.4 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.74 | 16.71 | 0.29 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.94 | 16.8 | 0.2 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.94 | 0.1 | 0.0 | 0.0 | 17.04 | 0.0 | 0.0 | 0.0 | 17.04 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100 | 2.04 | 5 | 0 | 107.04 | 22.0 | 0 | 0 | 85.04 |
|
||||
When Admin sets the business date to "01 March 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 3 EUR transaction amount
|
||||
And Admin does charge-off the loan on "01 March 2024"
|
||||
And Admin waives charge
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 5.0 | 0.0 | 22.0 | 22.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.54 | 0.46 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.05 | 17.0 | 0.0 | 3.0 | 0.0 | 20.0 | 0.0 | 0.0 | 0.0 | 3.0 | 17.0 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.05 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.05 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.05 | 0.0 | 0.0 | 0.0 | 16.05 | 0.0 | 0.0 | 0.0 | 0.0 | 16.05 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Waived | Outstanding |
|
||||
| 100 | 1.05 | 8 | 0 | 109.05 | 22.0 | 0 | 0 | 3.0 | 84.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 22.0 | 16.41 | 0.59 | 5.0 | 0.0 | 83.59 | false | false |
|
||||
| 01 March 2024 | Waive loan charges | 3.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
| 01 March 2024 | Charge-off | 84.05 | 83.59 | 0.46 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
Scenario: Charge-off on due date when loan behaviour is zero-interest and interestRecalculation = false
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
And Admin creates a client with random data
|
||||
@@ -2461,7 +2771,7 @@ Feature: Charge-off
|
||||
| 15 July 2023 | Charge-off | 102.03 | 100.0 | 2.03 | 0.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added before the charge-off date, loan behaviour is zero-interest and interestRecalculation = false
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -2479,6 +2789,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "27 February 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -2498,7 +2809,7 @@ Feature: Charge-off
|
||||
| 28 February 2023 | Charge-off | 104.02 | 100.0 | 1.02 | 3.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added on charge-off date, loan behaviour is zero-interest and interestRecalculation = false
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -2516,6 +2827,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "28 February 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -2535,7 +2847,7 @@ Feature: Charge-off
|
||||
| 28 February 2023 | Charge-off | 104.02 | 100.0 | 1.02 | 3.0 | 0.0 | 0.0 |
|
||||
|
||||
Scenario: Charge-off when charge is added after the charge off date, loan behaviour is zero-interest and interestRecalculation = false
|
||||
When Admin sets the business date to "1 March 2023"
|
||||
When Admin sets the business date to "1 January 2023"
|
||||
And Admin creates a client with random data
|
||||
When Admin creates a new zero charge-off Loan without interest recalculation and with date: "1 January 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
@@ -2553,6 +2865,7 @@ Feature: Charge-off
|
||||
And Admin successfully approves the loan on "1 January 2023" with "100" amount and expected disbursement date on "1 January 2023"
|
||||
And Admin successfully disburse the loan on "1 January 2023" with "100" EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "1 March 2023" due date and 3 EUR transaction amount
|
||||
When Admin sets the business date to "28 February 2023"
|
||||
And Admin does charge-off the loan on "28 February 2023"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4039,7 +4352,7 @@ Feature: Charge-off
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 5 EUR transaction amount
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin adds an NSF fee because of payment bounce with "29 February 2024" transaction date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4057,14 +4370,13 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin does charge-off the loan on "15 February 2024"
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 0.0 | 83.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 10.0 | 15.0 | 0.0 | 0.0 | 0.0 | 15.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 10.0 | 93.81 | 0.0 | 0.0 | 0.0 | 93.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 0.0 | 5.0 | 0.0 | 0.0 | 0.0 | 5.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 0.82 | 5.0 | 10.0 | 115.82 | 17.01 | 0.0 | 0.0 | 98.81 |
|
||||
@@ -4072,7 +4384,7 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 February 2024 | Charge-off | 88.81 | 83.57 | 0.24 | 5.0 | 0.0 | 0.0 | false | false |
|
||||
| 15 February 2024 | Charge-off | 98.81 | 83.57 | 0.24 | 5.0 | 10.0 | 0.0 | false | false |
|
||||
|
||||
Scenario: Verify accelerate maturity to charge-off date when interest recalculation is enabled - case when fee and penalty charges due dates is after charge-off date, and one charge is waived after charge-off
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
@@ -4100,7 +4412,7 @@ Feature: Charge-off
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 5 EUR transaction amount
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin adds an NSF fee because of payment bounce with "29 February 2024" transaction date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4118,14 +4430,13 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin does charge-off the loan on "15 February 2024"
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 0.0 | 83.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 10.0 | 15.0 | 0.0 | 0.0 | 0.0 | 15.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 10.0 | 93.81 | 0.0 | 0.0 | 0.0 | 93.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 0.0 | 5.0 | 0.0 | 0.0 | 0.0 | 5.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 0.82 | 5.0 | 10.0 | 115.82 | 17.01 | 0.0 | 0.0 | 98.81 |
|
||||
@@ -4133,23 +4444,23 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 February 2024 | Charge-off | 88.81 | 83.57 | 0.24 | 5.0 | 0.0 | 0.0 | false | false |
|
||||
And Admin waives due date charge
|
||||
| 15 February 2024 | Charge-off | 98.81 | 83.57 | 0.24 | 5.0 | 10.0 | 0.0 | false | false |
|
||||
And Admin waives charge
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 0.0 | 83.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 10.0 | 15.0 | 0.0 | 0.0 | 0.0 | 15.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.57 | 0.24 | 0.0 | 10.0 | 93.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 0.0 | 5.0 | 0.0 | 0.0 | 0.0 | 5.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 0.82 | 5.0 | 10.0 | 115.82 | 17.01 | 0.0 | 0.0 | 98.81 |
|
||||
| 100.0 | 0.82 | 5.0 | 10.0 | 115.82 | 17.01 | 0.0 | 0.0 | 88.81 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 February 2024 | Charge-off | 88.81 | 83.57 | 0.24 | 5.0 | 0.0 | 0.0 | false | false |
|
||||
| 15 February 2024 | Waive loan charges | 5.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 February 2024 | Waive loan charges | 10.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 February 2024 | Charge-off | 88.81 | 83.57 | 0.24 | 5.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
Scenario: Verify accelerate maturity to charge-off date when interest recalculation is disabled - case when one fee charge due date is before charge-off date
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
@@ -4534,7 +4845,7 @@ Feature: Charge-off
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.00 EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 5 EUR transaction amount
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin adds an NSF fee because of payment bounce with "29 February 2024" transaction date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4552,7 +4863,6 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.0 | 16.41 | 0.59 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin does charge-off the loan on "15 February 2024"
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4593,7 +4903,7 @@ Feature: Charge-off
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.00 EUR transaction amount
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 5 EUR transaction amount
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin adds an NSF fee because of payment bounce with "29 February 2024" transaction date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4611,7 +4921,6 @@ Feature: Charge-off
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.0 | 16.41 | 0.59 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
And Admin does charge-off the loan on "15 February 2024"
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
@@ -4627,21 +4936,21 @@ Feature: Charge-off
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.0 | 16.41 | 0.59 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
| 15 February 2024 | Charge-off | 98.81 | 83.59 | 0.22 | 5.0 | 10.0 | 0.0 | false | false |
|
||||
And Admin waives due date charge
|
||||
And Admin waives charge
|
||||
Then Loan Repayment schedule has 3 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.59 | 16.41 | 0.59 | 0.0 | 0.0 | 17.0 | 17.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.59 | 0.22 | 0.0 | 0.0 | 83.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 10.0 | 15.0 | 0.0 | 0.0 | 0.0 | 15.0 |
|
||||
| 2 | 14 | 15 February 2024 | | 0.0 | 83.59 | 0.22 | 0.0 | 10.0 | 93.81 | 0.0 | 0.0 | 0.0 | 83.81 |
|
||||
| 3 | 19 | 05 March 2024 | | 0.0 | 0.0 | 0.0 | 5.0 | 0.0 | 5.0 | 0.0 | 0.0 | 0.0 | 5.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 0.81 | 5.0 | 10.0 | 115.81 | 17.0 | 0.0 | 0.0 | 98.81 |
|
||||
| 100.0 | 0.81 | 5.0 | 10.0 | 115.81 | 17.0 | 0.0 | 0.0 | 88.81 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.0 | 16.41 | 0.59 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
| 15 February 2024 | Waive loan charges | 5.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
| 15 February 2024 | Waive loan charges | 10.0 | 0.0 | 0.0 | 0.0 | 0.0 | 83.59 | false | false |
|
||||
| 15 February 2024 | Charge-off | 88.81 | 83.59 | 0.22 | 5.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
@TestRailId:C3352 @AdvancedPaymentAllocation
|
||||
|
||||
Reference in New Issue
Block a user