FINERACT-2070: E2E testcase migration - feature files - pt5
This commit is contained in:
@@ -1,13 +1,13 @@
|
||||
@LoanReAgingFeature
|
||||
Feature: LoanReAging
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3050 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction happy path works properly
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
@@ -25,21 +25,21 @@ Feature: LoanReAging
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 6 |
|
||||
Then Loan Repayment schedule has 10 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 625.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 500.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 7 | 30 | 01 May 2024 | | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 8 | 31 | 01 June 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 9 | 30 | 01 July 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 10 | 31 | 01 August 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 625.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 500.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 7 | 30 | 01 May 2024 | | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 8 | 31 | 01 June 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 9 | 30 | 01 July 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 10 | 31 | 01 August 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 250.0| 0.0 | 0.0 | 750.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 250.0 | 0.0 | 0.0 | 750.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -47,13 +47,13 @@ Feature: LoanReAging
|
||||
| 20 February 2024 | Re-age | 750.0 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
Then Admin checks that delinquency range is: "NO_DELINQUENCY" and has delinquentDate ""
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3051 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction made by Loan external ID happy path works properly
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
@@ -67,29 +67,29 @@ Feature: LoanReAging
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin creates a Loan re-aging transaction by Loan external ID with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 30 | DAYS | 10 March 2024 | 2 |
|
||||
| 30 | DAYS | 10 March 2024 | 2 |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
|
||||
| 6 | 30 | 09 April 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
|
||||
| 6 | 30 | 09 April 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
| 01 January 2024 | Down Payment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 20 February 2024 | Re-age | 750.0 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3052 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction undo works properly
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
@@ -108,13 +108,13 @@ Feature: LoanReAging
|
||||
| 1 | DAYS | 10 March 2024 | 1 |
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
Then Loan Repayment schedule has 5 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 0.0 | 750.0 | 0.0 | 0.0 | 0.0 | 750.0 | 0.0 | 0.0 | 0.0 | 750.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 0.0 | 750.0 | 0.0 | 0.0 | 0.0 | 750.0 | 0.0 | 0.0 | 0.0 | 750.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -137,22 +137,22 @@ Feature: LoanReAging
|
||||
Then Admin checks that delinquency range is: "RANGE_30" and has delinquentDate "2024-01-19"
|
||||
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3053 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction works properly when chargeback happens after re-aging
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_ADV_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin runs inline COB job for Loan
|
||||
Then Admin checks that delinquency range is: "RANGE_30" and has delinquentDate "2024-01-04"
|
||||
@@ -173,15 +173,15 @@ Feature: LoanReAging
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 2 | MONTHS | 10 March 2024 | 3 |
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 6 | 61 | 10 May 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 6 | 61 | 10 May 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -190,18 +190,18 @@ Feature: LoanReAging
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
When Admin makes "REPAYMENT_ADJUSTMENT_CHARGEBACK" chargeback with 250 EUR transaction amount
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 500.0 | 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 0.0 | 0.0 | 0.0 | 500.0 |
|
||||
| 6 | 61 | 10 May 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 500.0 | 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 0.0 | 0.0 | 0.0 | 500.0 |
|
||||
| 6 | 61 | 10 May 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1250.0 | 0.0 | 0.0 | 0.0 | 1250.0 | 250.0| 0.0 | 0.0 | 1000.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1250.0 | 0.0 | 0.0 | 0.0 | 1250.0 | 250.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -209,81 +209,93 @@ Feature: LoanReAging
|
||||
| 21 February 2024 | Re-age | 750.0 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
| 25 February 2024 | Chargeback | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
|
||||
@Skip @AdvancedPaymentAllocation
|
||||
@TestRailId:C3054 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction - reverse-replay scenario 1
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
When Admin runs inline COB job for Loan
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
When Admin runs inline COB job for Loan
|
||||
When Admin sets the business date to "27 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyType | startDate | numberOfInstallments |
|
||||
| MONTHS | 01 March 2024 | 6 |
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 125 EUR transaction amount
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 6 |
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 250 EUR transaction amount
|
||||
When Admin successfully undo Loan re-aging transaction
|
||||
# TODO fill with proper expected data
|
||||
# Then Loan Repayment schedule has 10 periods, with the following data for periods:
|
||||
# | Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
# | | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
# | 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
# | 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
# | 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
# | 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
# | 5 | 15 | 01 March 2024 | | 750.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# | 6 | 15 | 01 April 2024 | | 625.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# | 7 | 15 | 01 May 2024 | | 500.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# | 8 | 15 | 01 June 2024 | | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# | 9 | 15 | 01 July 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# | 10 | 15 | 01 August 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
# Then Loan Repayment schedule has the following data in Total row:
|
||||
# | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
# | 1000.0 | 0.0 | 0.0 | 20.0 | 1020.0 | 0.0 | 0.0 | 0.0 | 1020.0 |
|
||||
# Then Loan Transactions tab has the following data:
|
||||
# | Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
# | 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
|
||||
# | 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false |
|
||||
# | 01 February 2024 | Repayment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 250.0 | false |
|
||||
# | 27 February 2024 | Re-age | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 125.0 | true |
|
||||
# Then Admin checks that delinquency range is: "RANGE_30" and has delinquentDate "2024-01-19"
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 01 February 2024 | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 250.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 500.0 | 0.0 | 250.0 | 500.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
| 01 January 2024 | Down Payment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 01 February 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
|
||||
| 27 February 2024 | Re-age | 500.0 | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | true |
|
||||
|
||||
@Skip @AdvancedPaymentAllocation
|
||||
@TestRailId:C3055 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction - reverse-replay scenario 2
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
When Admin runs inline COB job for Loan
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
When Admin runs inline COB job for Loan
|
||||
When Admin sets the business date to "27 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyType | startDate | numberOfInstallments |
|
||||
| MONTHS | 01 March 2024 | 6 |
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 6 |
|
||||
When Customer undo "1"th "Down Payment" transaction made on "01 January 2024"
|
||||
When Admin successfully undo Loan re-aging transaction
|
||||
# TODO fill with proper expected data and checks
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 1000.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
| 01 January 2024 | Down Payment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | true |
|
||||
| 27 February 2024 | Re-age | 1000.0 | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | true |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3056 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction - chargeback before maturity and prior to re-aging
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_ADV_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 January 2024" with 250 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
@@ -312,22 +324,22 @@ Feature: LoanReAging
|
||||
| 01 January 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 02 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 0.0 | 1125.0 | 250.0| 0.0 | 0.0 | 875.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 0.0 | 1125.0 | 250.0 | 0.0 | 0.0 | 875.0 |
|
||||
When Admin sets the business date to "21 February 2024"
|
||||
When Admin creates a Loan re-aging transaction by Loan external ID with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 2 | MONTHS | 10 March 2024 | 3 |
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024| 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 583.33 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67| 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 6 | 61 | 10 May 2024 | | 291.66 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67| 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66| 0.0 | 0.0 | 0.0 | 291.66 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024 | 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 24 | 10 March 2024 | | 583.33 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 6 | 61 | 10 May 2024 | | 291.66 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 7 | 61 | 10 July 2024 | | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -335,22 +347,22 @@ Feature: LoanReAging
|
||||
| 02 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
| 21 February 2024 | Re-age | 875.0 | 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3057 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction - chargeback after maturity date and prior to re-aging
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_ADV_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 January 2024" with 250 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
@@ -380,23 +392,23 @@ Feature: LoanReAging
|
||||
| 01 January 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 20 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 0.0 | 1125.0 | 250.0| 0.0 | 0.0 | 875.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 0.0 | 1125.0 | 250.0 | 0.0 | 0.0 | 875.0 |
|
||||
When Admin sets the business date to "21 February 2024"
|
||||
When Admin creates a Loan re-aging transaction by Loan external ID with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 2 | MONTHS | 10 March 2024 | 3 |
|
||||
Then Loan Repayment schedule has 8 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024| 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 5 | 20 February 2024 | 21 February 2024| 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 6 | 19 | 10 March 2024 | | 583.33 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67| 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 7 | 61 | 10 May 2024 | | 291.66 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67| 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 8 | 61 | 10 July 2024 | | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66| 0.0 | 0.0 | 0.0 | 291.66 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 21 February 2024 | 750.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 5 | 20 February 2024 | 21 February 2024 | 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 6 | 19 | 10 March 2024 | | 583.33 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 7 | 61 | 10 May 2024 | | 291.66 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 | 0.0 | 0.0 | 0.0 | 291.67 |
|
||||
| 8 | 61 | 10 July 2024 | | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66 | 0.0 | 0.0 | 0.0 | 291.66 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
@@ -404,22 +416,22 @@ Feature: LoanReAging
|
||||
| 20 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
| 21 February 2024 | Re-age | 875.0 | 875.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3058 @AdvancedPaymentAllocation
|
||||
Scenario: Verify that Loan re-aging transaction - chargeback after maturity date and prior to re-aging with charge N+1 installment
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_ADV_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 1000 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "1000" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "1000" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 500.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 January 2024" with 250 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
@@ -450,86 +462,86 @@ Feature: LoanReAging
|
||||
| 01 January 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 26 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 20.0 | 1145.0 | 250.0| 0.0 | 0.0 | 895.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 20.0 | 1145.0 | 250.0 | 0.0 | 0.0 | 895.0 |
|
||||
When Admin sets the business date to "27 February 2024"
|
||||
When Admin makes a charge adjustment for the last "LOAN_NSF_FEE" type charge which is due on "26 February 2024" with 20 EUR transaction amount and externalId ""
|
||||
When Admin creates a Loan re-aging transaction by Loan external ID with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 2 | MONTHS | 10 March 2024 | 3 |
|
||||
Then Loan Repayment schedule has 8 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 27 February 2024| 730.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 0.0 | 20.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 27 February 2024| 730.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 27 February 2024| 730.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 11 | 26 February 2024 | | 855.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 |
|
||||
| 6 | 13 | 10 March 2024 | | 570.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
| 7 | 61 | 10 May 2024 | | 285.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
| 8 | 61 | 10 July 2024 | | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 1000.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 750.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 27 February 2024 | 730.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 0.0 | 20.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 27 February 2024 | 730.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 27 February 2024 | 730.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 11 | 26 February 2024 | | 855.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 |
|
||||
| 6 | 13 | 10 March 2024 | | 570.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
| 7 | 61 | 10 May 2024 | | 285.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
| 8 | 61 | 10 July 2024 | | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 | 0.0 | 0.0 | 0.0 | 285.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
| 01 January 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 26 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
| 27 February 2024 | Charge Adjustment| 20.0 | 20.0 | 0.0 | 0.0 | 0.0 | 855.0 | false |
|
||||
| 27 February 2024 | Re-age | 855.0 | 855.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 1000.0 | 0.0 | 0.0 | 0.0 | 0.0 | 1000.0 | false |
|
||||
| 01 January 2024 | Repayment | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 750.0 | false |
|
||||
| 26 February 2024 | Chargeback | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 875.0 | false |
|
||||
| 27 February 2024 | Charge Adjustment | 20.0 | 20.0 | 0.0 | 0.0 | 0.0 | 855.0 | false |
|
||||
| 27 February 2024 | Re-age | 855.0 | 855.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 20.0 | 1145.0 | 270.0| 0.0 | 20.0 | 875.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 1125.0 | 0.0 | 0.0 | 20.0 | 1145.0 | 270.0 | 0.0 | 20.0 | 875.0 |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3059 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction - partial principal payment scenario + undo re-ageing
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
When Admin sets the business date to "16 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 50 EUR transaction amount
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 50.0 | 0.0 | 0.0 | 75.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 50.0 | 0.0 | 0.0 | 75.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false |
|
||||
| 16 January 2024 | Repayment | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 | 325.0 | false |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 175.0 | 0.0 | 0.0 | 325.0 |
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 175.0 | 0.0 | 0.0 | 325.0 |
|
||||
When Admin sets the business date to "27 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 6 |
|
||||
Then Loan Repayment schedule has 10 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 27 February 2024| 325.0 | 50.0 | 0.0 | 0.0 | 0.0 | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 27 February 2024| 325.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 27 February 2024| 325.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 271.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 217.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 7 | 30 | 01 May 2024 | | 163.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 8 | 31 | 01 June 2024 | | 109.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 9 | 30 | 01 July 2024 | | 55.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 10 | 31 | 01 August 2024 | | 0.0 | 55.0 | 0.0 | 0.0 | 0.0 | 55.0 | 0.0 | 0.0 | 0.0 | 55.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 27 February 2024 | 325.0 | 50.0 | 0.0 | 0.0 | 0.0 | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 27 February 2024 | 325.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 27 February 2024 | 325.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 271.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 217.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 7 | 30 | 01 May 2024 | | 163.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 8 | 31 | 01 June 2024 | | 109.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 9 | 30 | 01 July 2024 | | 55.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 | 0.0 | 0.0 | 0.0 | 54.0 |
|
||||
| 10 | 31 | 01 August 2024 | | 0.0 | 55.0 | 0.0 | 0.0 | 0.0 | 55.0 | 0.0 | 0.0 | 0.0 | 55.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
|
||||
@@ -539,12 +551,12 @@ Feature: LoanReAging
|
||||
When Admin sets the business date to "29 February 2024"
|
||||
When Admin successfully undo Loan re-aging transaction
|
||||
Then Loan Repayment schedule has 4 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 50.0 | 0.0 | 0.0 | 75.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 50.0 | 0.0 | 0.0 | 75.0 |
|
||||
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
|
||||
@@ -552,13 +564,13 @@ Feature: LoanReAging
|
||||
| 16 January 2024 | Repayment | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 | 325.0 | false |
|
||||
| 27 February 2024 | Re-age | 325.0 | 325.0 | 0.0 | 0.0 | 0.0 | 0.0 | true |
|
||||
|
||||
@AdvancedPaymentAllocation
|
||||
@TestRailId:C3091 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-age transaction - Event check
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
@@ -570,3 +582,228 @@ Feature: LoanReAging
|
||||
| 1 | MONTHS | 01 March 2024 | 6 |
|
||||
Then LoanDelinquencyRangeChangeBusinessEvent is created
|
||||
Then LoanReAgeBusinessEvent is created
|
||||
|
||||
@TestRailId:C3107 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction reverse-replay - UC1: undo old repayment
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
When Admin sets the business date to "16 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 125 EUR transaction amount
|
||||
# --- Re-aging transaction ---
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 2 |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 16 January 2024 | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 250.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Repayment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 250.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
# --- Undo repayment ---
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
When Customer undo "1"th "Repayment" transaction made on "16 January 2024"
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 187.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Repayment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 250.0 | true | false |
|
||||
| 20 February 2024 | Re-age | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
@TestRailId:C3108 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction reverse-replay - UC2: backdated repayment
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
# --- Re-aging transaction ---
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 2 |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 187.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
# --- Backdated repayment ---
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 125 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 16 January 2024 | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 250.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Repayment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 250.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
@TestRailId:C3109 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction reverse-replay - UC3: backdated disbursement
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
# --- Re-aging transaction ---
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 2 |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 187.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 375.0 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
# --- Backdated disbursement ---
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
When Admin successfully disburse the loan on "16 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 20 February 2024 | 350.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
|
||||
| | | 16 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 3 | 0 | 16 January 2024 | 20 February 2024 | 450.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 31 January 2024 | 20 February 2024 | 450.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 15 February 2024 | 20 February 2024 | 450.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 6 | 15 | 01 March 2024 | | 225.0 | 225.0 | 0.0 | 0.0 | 0.0 | 225.0 | 0.0 | 0.0 | 0.0 | 225.0 |
|
||||
| 7 | 31 | 01 April 2024 | | 0.0 | 225.0 | 0.0 | 0.0 | 0.0 | 225.0 | 0.0 | 0.0 | 0.0 | 225.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 600.0 | 0.0 | 0.0 | 0.0 | 600.0 | 150.0 | 0.0 | 0.0 | 450.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 475.0 | false | false |
|
||||
| 16 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 450.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 450.0 | 450.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||
@TestRailId:C3110 @AdvancedPaymentAllocation
|
||||
Scenario: Verify Loan re-aging transaction reverse-replay - UC4: backdated charge
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
|
||||
When Admin sets the business date to "16 January 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 145 EUR transaction amount
|
||||
# --- Re-aging transaction ---
|
||||
When Admin sets the business date to "20 February 2024"
|
||||
When Admin creates a Loan re-aging transaction with the following data:
|
||||
| frequencyNumber | frequencyType | startDate | numberOfInstallments |
|
||||
| 1 | MONTHS | 01 March 2024 | 2 |
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 16 January 2024 | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 230.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 20.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 230.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 115.0 | 115.0 | 0.0 | 0.0 | 0.0 | 115.0 | 0.0 | 0.0 | 0.0 | 115.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 115.0 | 0.0 | 0.0 | 0.0 | 115.0 | 0.0 | 0.0 | 0.0 | 115.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 270.0 | 20.0 | 0.0 | 230.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Repayment | 145.0 | 145.0 | 0.0 | 0.0 | 0.0 | 230.0 | false | false |
|
||||
| 20 February 2024 | Re-age | 230.0 | 230.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
# --- Backdated charge ---
|
||||
When Admin sets the business date to "25 February 2024"
|
||||
When Admin adds "LOAN_NSF_FEE" due date charge with "15 January 2024" due date and 20 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 15 | 16 January 2024 | 16 January 2024 | 250.0 | 125.0 | 0.0 | 0.0 | 20.0 | 145.0 | 145.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 15 | 31 January 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 15 | 15 February 2024 | 20 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 5 | 15 | 01 March 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
| 6 | 31 | 01 April 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 500.0 | 0.0 | 0.0 | 20.0 | 520.0 | 270.0 | 0.0 | 0.0 | 250.0 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false | false |
|
||||
| 16 January 2024 | Repayment | 145.0 | 125.0 | 0.0 | 0.0 | 20.0 | 250.0 | false | true |
|
||||
| 20 February 2024 | Re-age | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
|
||||
|
||||