Files
cbsnexora-backend/fineract-e2e-tests-runner/src/test/resources/features/LoanReAmortization.feature
T

1716 lines
216 KiB
Gherkin

@LoanReAmortizationFeature
Feature: LoanReAmortization
@TestRailId:C3069 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - re-amortization happy path
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "25 January 2024"
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 25 January 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | | 188.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 25 January 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3070 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - re-amortization happy path with loan externalId
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "25 January 2024"
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
When When Admin creates a Loan re-amortization transaction on current business date by loan external ID
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 25 January 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | | 188.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 25 January 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3071 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - re-amortization undo happy path
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 25 January 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | | 188.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false |
| 25 January 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 | false |
When Admin sets the business date to "26 January 2024"
When When Admin undo Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 | false |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 | false |
| 25 January 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 | true |
Then Admin checks that delinquency range is: "RANGE_3" and has delinquentDate "2024-01-19"
@TestRailId:C3072 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - delinquency calculation triggered upon re-amortization transaction
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "24 January 2024"
When Admin runs inline COB job for Loan
Then Admin checks that delinquency range is: "RANGE_3" and has delinquentDate "2024-01-19"
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Admin checks that delinquency range is: "NO_DELINQUENCY" and has delinquentDate ""
@TestRailId:C3073 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC1: re-amortization after charge applied on loan
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "16 January 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "16 January 2024" due date and 10 EUR transaction amount
When Admin sets the business date to "25 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 375.0 | 0.0 | 0.0 | 0.0 | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
| 3 | 15 | 31 January 2024 | | 188.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 | 0.0 | 0.0 | 0.0 | 187.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 | 0.0 | 0.0 | 0.0 | 188.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 10.0 | 510.0 | 125.0 | 0.0 | 0.0 | 385.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 25 January 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3074 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC2: complete past due principal amount reamortization scenario
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 01 February 2024 | Re-amortize | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3075 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC3: reverse replay scenario
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 125.0 | 0.0 | 0.0 | 375.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 01 February 2024 | Re-amortize | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 |
When Admin sets the business date to "02 February 2024"
And Customer makes "AUTOPAY" repayment on "15 January 2024" with 125 EUR transaction amount
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 15 January 2024 | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 125.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 01 February 2024 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 | 0.0 | 0.0 | 0.0 | 250.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 250.0 | 125.0 | 0.0 | 250.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 15 January 2024 | Repayment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 250.0 |
| 01 February 2024 | Re-amortize | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3076 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC4: N+1 Installment scenario
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "01 February 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "27 February 2024" due date and 10 EUR transaction amount
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 5 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 01 February 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 5 | 12 | 27 February 2024 | | 0.0 | 0.0 | 0.0 | 0.0 | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 10.0 | 510.0 | 125.0 | 0.0 | 0.0 | 385.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 01 February 2024 | Re-amortize | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3077 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC5: re-amortization on same day of installment
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "16 January 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "16 January 2024" due date and 10 EUR transaction amount
When Admin sets the business date to "31 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 375.0 | 0.0 | 0.0 | 0.0 | 10.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
| 3 | 15 | 31 January 2024 | 31 January 2024 | 375.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 | 0.0 | 0.0 | 0.0 | 375.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 10.0 | 510.0 | 125.0 | 0.0 | 0.0 | 385.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 31 January 2024 | Re-amortize | 250.0 | 250.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3078 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - UC6: Parital Paid Scenario
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "17 January 2024"
And Customer makes "AUTOPAY" repayment on "17 January 2024" with 50 EUR transaction amount
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 250.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 50.0 | 0.0 | 50.0 | 75.0 |
| 3 | 15 | 31 January 2024 | | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 175.0 | 0.0 | 50.0 | 325.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 17 January 2024 | Repayment | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 | 325.0 |
When Admin sets the business date to "30 January 2024"
When When Admin creates a Loan re-amortization transaction on current business date by loan external ID
Then Loan Repayment schedule has 4 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 500.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 375.0 | 125.0 | 0.0 | 0.0 | 0.0 | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 30 January 2024 | 325.0 | 50.0 | 0.0 | 0.0 | 0.0 | 50.0 | 50.0 | 0.0 | 50.0 | 0.0 |
| 3 | 15 | 31 January 2024 | | 162.0 | 163.0 | 0.0 | 0.0 | 0.0 | 163.0 | 0.0 | 0.0 | 0.0 | 163.0 |
| 4 | 15 | 15 February 2024 | | 0.0 | 162.0 | 0.0 | 0.0 | 0.0 | 162.0 | 0.0 | 0.0 | 0.0 | 162.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 500.0 | 0.0 | 0.0 | 0.0 | 500.0 | 175.0 | 0.0 | 50.0 | 325.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance |
| 01 January 2024 | Disbursement | 500.0 | 0.0 | 0.0 | 0.0 | 0.0 | 500.0 |
| 01 January 2024 | Down Payment | 125.0 | 125.0 | 0.0 | 0.0 | 0.0 | 375.0 |
| 17 January 2024 | Repayment | 50.0 | 50.0 | 0.0 | 0.0 | 0.0 | 325.0 |
| 30 January 2024 | Re-amortize | 75.0 | 75.0 | 0.0 | 0.0 | 0.0 | 0.0 |
@TestRailId:C3089 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction - Event check
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 500 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 45 | DAYS | 15 | DAYS | 3 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "500" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "500" EUR transaction amount
When Admin sets the business date to "31 January 2024"
When Admin runs inline COB job for Loan
Then LoanDelinquencyRangeChangeBusinessEvent is created
When Admin sets the business date to "01 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then LoanDelinquencyRangeChangeBusinessEvent is created
Then LoanReAmortizeBusinessEvent is created
@TestRailId:C3112 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction reverse-replay - UC1: undo old repayment
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 800 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 75 | DAYS | 15 | DAYS | 5 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "800" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
When Admin sets the business date to "16 January 2024"
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 120 EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 16 January 2024 | 480.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 320.0 | 0.0 | 0.0 | 480.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Repayment | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 | 480.0 | false | false |
| 20 February 2024 | Re-amortize | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
# --- Undo repayment ---
When Admin sets the business date to "25 February 2024"
When Customer undo "1"th "Repayment" transaction made on "16 January 2024"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 300.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 200.0 | 0.0 | 0.0 | 600.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Repayment | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 | 480.0 | true | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
@TestRailId:C3113 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction reverse-replay - UC2: backdated repayment
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 800 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 75 | DAYS | 15 | DAYS | 5 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "800" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 300.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 200.0 | 0.0 | 0.0 | 600.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
# --- Backdated repayment ---
When Admin sets the business date to "25 February 2024"
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 120 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 16 January 2024 | 480.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 320.0 | 0.0 | 0.0 | 480.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Repayment | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 | 480.0 | false | false |
| 20 February 2024 | Re-amortize | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
@TestRailId:C3114 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction reverse-replay - UC3: backdated disbursement
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 800 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 75 | DAYS | 15 | DAYS | 5 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "800" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 300.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 200.0 | 0.0 | 0.0 | 600.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
# --- Backdated disbursement ---
When Admin sets the business date to "25 February 2024"
When Admin successfully disburse the loan on "16 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 575.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| | | 16 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 3 | 0 | 16 January 2024 | 20 February 2024 | 675.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 31 January 2024 | 20 February 2024 | 675.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 15 February 2024 | 20 February 2024 | 675.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 6 | 15 | 01 March 2024 | | 337.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 |
| 7 | 15 | 16 March 2024 | | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 900.0 | 0.0 | 0.0 | 0.0 | 900.0 | 225.0 | 0.0 | 0.0 | 675.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 700.0 | false | false |
| 16 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 675.0 | false | false |
| 20 February 2024 | Re-amortize | 398.0 | 398.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
@TestRailId:C3115 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction reverse-replay - UC4: backdated charge
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 800 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 75 | DAYS | 15 | DAYS | 5 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "800" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
When Admin sets the business date to "16 January 2024"
And Customer makes "AUTOPAY" repayment on "16 January 2024" with 140 EUR transaction amount
# --- Re-amortization transaction ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 16 January 2024 | 480.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 120.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 460.0 | 20.0 | 0.0 | 0.0 | 0.0 | 20.0 | 20.0 | 20.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 460.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 230.0 | 230.0 | 0.0 | 0.0 | 0.0 | 230.0 | 0.0 | 0.0 | 0.0 | 230.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 230.0 | 0.0 | 0.0 | 0.0 | 230.0 | 0.0 | 0.0 | 0.0 | 230.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 340.0 | 20.0 | 0.0 | 460.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Repayment | 140.0 | 140.0 | 0.0 | 0.0 | 0.0 | 460.0 | false | false |
| 20 February 2024 | Re-amortize | 220.0 | 220.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
# --- Backdated charge ---
When Admin sets the business date to "25 February 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "15 January 2024" due date and 20 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 16 January 2024 | 480.0 | 120.0 | 0.0 | 0.0 | 20.0 | 140.0 | 140.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 480.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 | 0.0 | 0.0 | 0.0 | 240.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 20.0 | 820.0 | 340.0 | 0.0 | 0.0 | 480.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 16 January 2024 | Repayment | 140.0 | 120.0 | 0.0 | 0.0 | 20.0 | 480.0 | false | true |
| 20 February 2024 | Re-amortize | 240.0 | 240.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | true |
@TestRailId:C3134 @AdvancedPaymentAllocation
Scenario: Verify Loan re-amortization transaction reverse-replay - UC5: re-amortization validation should not consider reverted transactions
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_DOWNPAYMENT_AUTO_ADVANCED_PAYMENT_ALLOCATION | 01 January 2024 | 800 | 0 | FLAT | SAME_AS_REPAYMENT_PERIOD | EQUAL_INSTALLMENTS | 75 | DAYS | 15 | DAYS | 5 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "800" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "800" EUR transaction amount
# --- Re-amortization transaction after 1st installment date ---
When Admin sets the business date to "20 February 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 15 | 01 March 2024 | | 300.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
| 6 | 15 | 16 March 2024 | | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 | 0.0 | 0.0 | 0.0 | 300.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 800.0 | 0.0 | 0.0 | 0.0 | 800.0 | 200.0 | 0.0 | 0.0 | 600.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
# --- Secnd disbursement with autopayment ---
When Admin sets the business date to "21 February 2024"
When Admin successfully disburse the loan on "21 February 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| | | 21 February 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 5 | 0 | 21 February 2024 | 21 February 2024 | 675.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 6 | 15 | 01 March 2024 | | 337.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 |
| 7 | 15 | 16 March 2024 | | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 900.0 | 0.0 | 0.0 | 0.0 | 900.0 | 225.0 | 0.0 | 0.0 | 675.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
| 21 February 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 700.0 | false | false |
| 21 February 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 675.0 | false | false |
# --- Undo autopayment of second disbursement ---
When Admin sets the business date to "22 February 2024"
And Customer undo "1"th "Down Payment" transaction made on "21 February 2024"
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 15 | 31 January 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 15 | 15 February 2024 | 20 February 2024 | 600.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| | | 21 February 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 5 | 0 | 21 February 2024 | | 675.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
| 6 | 15 | 01 March 2024 | | 337.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 | 0.0 | 0.0 | 0.0 | 338.0 |
| 7 | 15 | 16 March 2024 | | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 | 0.0 | 0.0 | 0.0 | 337.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 900.0 | 0.0 | 0.0 | 0.0 | 900.0 | 200.0 | 0.0 | 0.0 | 700.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | false | false |
| 21 February 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 700.0 | false | false |
| 21 February 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 675.0 | true | false |
# --- Undo re-amortization ---
When Admin sets the business date to "23 February 2024"
And When Admin undo Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 800.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 600.0 | 200.0 | 0.0 | 0.0 | 0.0 | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 |
| 2 | 15 | 16 January 2024 | | 480.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 |
| 3 | 15 | 31 January 2024 | | 360.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 |
| 4 | 15 | 15 February 2024 | | 240.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 | 0.0 | 0.0 | 0.0 | 120.0 |
| | | 21 February 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 5 | 0 | 21 February 2024 | | 315.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 |
| 6 | 15 | 01 March 2024 | | 157.0 | 158.0 | 0.0 | 0.0 | 0.0 | 158.0 | 0.0 | 0.0 | 0.0 | 158.0 |
| 7 | 15 | 16 March 2024 | | 0.0 | 157.0 | 0.0 | 0.0 | 0.0 | 157.0 | 0.0 | 0.0 | 0.0 | 157.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 900.0 | 0.0 | 0.0 | 0.0 | 900.0 | 200.0 | 0.0 | 0.0 | 700.0 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 800.0 | 0.0 | 0.0 | 0.0 | 0.0 | 800.0 | false | false |
| 01 January 2024 | Down Payment | 200.0 | 200.0 | 0.0 | 0.0 | 0.0 | 600.0 | false | false |
| 20 February 2024 | Re-amortize | 360.0 | 360.0 | 0.0 | 0.0 | 0.0 | 0.0 | true | false |
| 21 February 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 700.0 | false | false |
| 21 February 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 675.0 | true | false |
@TestRailId:C4304 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - UC1
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4305 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Principal and interest and Fees - UC2
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin sets the business date to "15 February 2024"
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 February 2024" due date and 10 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 10.0 | 0.0 | 27.01 | 0.0 | 0.0 | 0.0 | 27.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
And Loan Charges tab has the following data:
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
| Snooze fee | false | Specified due date | 15 February 2024 | Flat | 10.0 | 0.0 | 0.0 | 10.0 |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
And Loan Charges tab has the following data:
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
| Snooze fee | false | Specified due date | 15 February 2024 | Flat | 10.0 | 0.0 | 0.0 | 10.0 |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4306 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - N+1 Scenario - UC3
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin sets the business date to "15 July 2024"
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 July 2024" due date and 10 EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4307 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Charge-back before re-aging - UC4
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALC_EMI_360_30_CHARGEBACK_INTEREST_PENALTY_FEE_PRINCIPAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin makes "REPAYMENT_ADJUSTMENT_CHARGEBACK" chargeback with 17.01 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.14 | 32.86 | 1.16 | 0.0 | 0.0 | 34.02 | 0.0 | 0.0 | 0.0 | 34.02 |
| 3 | 31 | 01 April 2024 | | 50.52 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.8 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.99 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.99 | 0.1 | 0.0 | 0.0 | 17.09 | 0.0 | 0.0 | 0.0 | 17.09 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 116.43 | 2.72 | 0.0 | 0.0 | 119.15 | 17.01 | 0.0 | 0.0 | 102.14 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
| 01 February 2024 | Chargeback | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 76.08 | 23.92 | 1.74 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
| 4 | 30 | 01 May 2024 | | 50.86 | 25.22 | 0.44 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
| 5 | 31 | 01 June 2024 | | 25.5 | 25.36 | 0.3 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
| 6 | 30 | 01 July 2024 | | 0.0 | 25.5 | 0.15 | 0.0 | 0.0 | 25.65 | 0.0 | 0.0 | 0.0 | 25.65 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 116.43 | 3.21 | 0.0 | 0.0 | 119.64 | 17.01 | 0.0 | 0.0 | 102.63 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 01 February 2024 | Chargeback | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 100.0 | false | false |
| 15 March 2024 | Re-amortize | 34.02 | 32.86 | 1.16 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4308 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Partially paid installment - UC5
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 20.0 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.03 | 16.54 | 0.47 | 0.0 | 0.0 | 17.01 | 2.99 | 2.99 | 0.0 | 14.02 |
| 3 | 31 | 01 April 2024 | | 50.41 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.69 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.88 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.88 | 0.1 | 0.0 | 0.0 | 16.98 | 0.0 | 0.0 | 0.0 | 16.98 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.03 | 0.0 | 0.0 | 102.03 | 20.0 | 2.99 | 0.0 | 82.03 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 80.58 | 2.99 | 0.0 | 0.0 | 0.0 | 2.99 | 2.99 | 2.99 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 60.96 | 19.62 | 0.94 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 4 | 30 | 01 May 2024 | | 40.76 | 20.2 | 0.36 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 5 | 31 | 01 June 2024 | | 20.44 | 20.32 | 0.24 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 6 | 30 | 01 July 2024 | | 0.0 | 20.44 | 0.12 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.24 | 0.0 | 0.0 | 102.24 | 20.0 | 2.99 | 0.0 | 82.24 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false | false |
| 15 March 2024 | Re-amortize | 14.02 | 13.55 | 0.47 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4309 @AdvancedPaymentAllocation
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - DownPayment Scenarios - UC6
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_PYMNT_INTEREST_RECALCULATION_DAILY_EMI_360_30_MULTIDISBURSE_AUTO_DOWNPAYMENT" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_PYMNT_INTEREST_RECALCULATION_DAILY_EMI_360_30_MULTIDISBURSE_AUTO_DOWNPAYMENT | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024 | | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 25.0 | 0.0 | 0.0 | 76.54 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 12.76 EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024| 01 February 2024 | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 37.76 | 0.0 | 0.0 | 63.78 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024 | 01 February 2024 | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
| 3 | 29 | 01 March 2024 | 15 March 2024 | 62.68 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 31 | 01 April 2024 | | 47.43 | 15.25 | 0.74 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 5 | 30 | 01 May 2024 | | 31.72 | 15.71 | 0.28 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 6 | 31 | 01 June 2024 | | 15.92 | 15.8 | 0.19 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 7 | 30 | 01 July 2024 | | 0.0 | 15.92 | 0.09 | 0.0 | 0.0 | 16.01 | 0.0 | 0.0 | 0.0 | 16.01 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.74 | 0.0 | 0.0 | 101.74 | 37.76 | 0.0 | 0.0 | 63.98 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
| 15 March 2024 | Re-amortize | 12.76 | 12.39 | 0.37 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4219 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC1: Principal and interest re-amortization
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# --- Repayment on due date ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.09 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.09 | 0.24 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortization | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4220 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC2: Principal interest and fee re-amortization
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# --- Repayment on due date and snooze fee added ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
And Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 February 2024" due date and 10 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 10.0 | 0.0 | 27.01 | 0.0 | 0.0 | 0.0 | 27.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 2.5 | 0.0 | 23.82 | 0.0 | 0.0 | 0.0 | 23.82 |
| 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 2.5 | 0.0 | 23.82 | 0.0 | 0.0 | 0.0 | 23.82 |
| 5 | 31 | 01 June 2024 | | 21.09 | 20.95 | 0.37 | 2.5 | 0.0 | 23.82 | 0.0 | 0.0 | 0.0 | 23.82 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.09 | 0.24 | 2.5 | 0.0 | 23.83 | 0.0 | 0.0 | 0.0 | 23.83 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortization | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4221 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC3: Principal interest and fee re-amortization, N+1 installment
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# --- Repayment on due date and snooze fee added ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
And Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 July 2024" due date and 10 EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.09 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.09 | 0.24 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortization | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4222 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC4: Principal interest re-amortization, chargeback
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# --- Repayment on due date and chargeback added ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
And Customer makes "REPAYMENT_ADJUSTMENT_CHARGEBACK" repayment on "01 February 2024" with 17.01 EUR transaction amount
# TODO check numbers - is google sheet state OK for sure after chargeback?
# Then Loan Repayment schedule has 6 periods, with the following data for periods:
# | Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
# | | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
# | 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
# | 2 | 29 | 01 March 2024 | 01 February 2024 | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
# | 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
# | 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
# | 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
# | 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
# And Loan Repayment schedule has the following data in Total row:
# | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
# | 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
# And Loan Transactions tab has the following data:
# | Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |Replayed|
# | 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |false |
# | 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |false |
## --- Re-amortization transaction ---
# When Admin sets the business date to "15 March 2024"
# And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
# Then Loan Repayment schedule has 6 periods, with the following data for periods:
# | Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
# | | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
# | 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
# | 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
# | 3 | 31 | 01 April 2024 | | 62.86 | 20.71 | 0.61 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
# | 4 | 30 | 01 May 2024 | | 42.03 | 20.83 | 0.49 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
# | 5 | 31 | 01 June 2024 | | 21.09 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
# | 6 | 30 | 01 July 2024 | | 0.0 | 21.09 | 0.24 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
# | 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
# And Loan Repayment schedule has the following data in Total row:
# | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
# | 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
# And Loan Transactions tab has the following data:
# | Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
# | 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# | 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
# | 15 March 2024 | Re-amortization | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4223 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC5: Principal interest and fee re-amortization, partial payment
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
# --- Repayment on due date and partially paid next installment ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 20.0 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.03 | 16.54 | 0.47 | 0.0 | 0.0 | 17.01 | 2.99 | 2.99 | 0.0 | 14.02 |
| 3 | 31 | 01 April 2024 | | 50.41 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.69 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.88 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.88 | 0.1 | 0.0 | 0.0 | 16.98 | 0.0 | 0.0 | 0.0 | 16.98 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.03 | 10.0 | 0.0 | 102.03 | 20.0 | 2.99 | 0.0 | 82.03 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 80.58 | 2.99 | 0.0 | 0.0 | 0.0 | 2.99 | 2.99 | 2.99 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 60.61 | 19.97 | 0.59 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 4 | 30 | 01 May 2024 | | 42.53 | 20.08 | 0.48 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 5 | 31 | 01 June 2024 | | 20.32 | 20.2 | 0.36 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
| 6 | 30 | 01 July 2024 | | 0.0 | 20.32 | 0.24 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.24 | 0.0 | 0.0 | 102.24 | 20.0 | 2.99 | 0.0 | 82.24 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false | false |
| 15 March 2024 | Re-amortization | 14.02 | 13.55 | 0.47 | 0.0 | 0.0 | 0.0 | false | false |
@TestRailId:C4224 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization transaction on interest bearing loan - Interest handling: EQUAL_AMORTIZATION_INTEREST_SPLIT - UC6: Principal and interest re-amortization, downpayment
When Admin sets the business date to "01 January 2024"
And Admin creates a client with random data
And Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_PYMNT_INTEREST_DAILY_EMI_360_30_DOWNPAYMENT | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
And Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
And Customer makes "AUTOPAY" repayment on "01 January 2024" with 25.0 EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024 | | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 25.0 | 0.0 | 0.0 | 76.54 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Repayment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
# --- Repayment on due date ---
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 12.76 EUR transaction amount
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024 | 01 February 2024 | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 37.76 | 0.0 | 0.0 | 63.78 |
And Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Repayment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
# --- Re-amortization transaction ---
When Admin sets the business date to "15 March 2024"
And Admin creates a Loan re-amortization transaction on current business date with reAmortizationInterestHandling "EQUAL_AMORTIZATION_INTEREST_SPLIT"
# TODO check numbers is google sheet state OK for sure?
Then Loan Repayment schedule has 7 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
| 2 | 31 | 01 February 2024 | 01 February 2024 | 74.56 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
| 3 | 29 | 01 March 2024 | | 74.56 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 31 | 01 April 2024 | | 59.03 | 15.53 | 0.46 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 5 | 30 | 01 May 2024 | | 43.41 | 15.62 | 0.37 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 6 | 31 | 01 June 2024 | | 29.69 | 15.72 | 0.27 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
| 7 | 30 | 01 July 2024 | | 11.88 | 15.81 | 0.18 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
And Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 37.76 | 0.0 | 0.0 | 63.96 |
And Loan Transactions tab has the following data:1
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 January 2024 | Repayment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
| 15 March 2024 | Re-amortization | 12.76 | 12.39 | 0.37 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
#will be handled in separate story
@Skip
@TestRailId:C4310 @AdvancedPaymentAllocation
Scenario: Verify multiple Re-amortizations on the same loan - Interest calculation: Default Behavior - Multiple Re-amortizations on the same loan
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Admin sets the business date to "01 April 2024"
And Customer makes "AUTOPAY" repayment on "01 April 2024" with 21.32 EUR transaction amount
When Admin sets the business date to "15 May 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | 01 April 2024 | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 21.32 | 0.0 | 0.0 | 0.0 |
| 4 | 30 | 01 May 2024 | 15 May 2024 | 63.23 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 5 | 31 | 01 June 2024 | | 31.89 | 31.34 | 0.74 | 0.0 | 0.0 | 32.08 | 0.0 | 0.0 | 0.0 | 32.08 |
| 6 | 30 | 01 July 2024 | | 0.0 | 31.89 | 0.19 | 0.0 | 0.0 | 32.08 | 0.0 | 0.0 | 0.0 | 32.08 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.49 | 0.0 | 0.0 | 102.49 | 38.33 | 0.0 | 0.0 | 64.16 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
| 01 April 2024 | Repayment | 21.32 | 20.34 | 0.98 | 0.0 | 0.0 | 63.23 | false | false |
| 15 May 2024 | Re-amortize | 21.32 | 20.95 | 0.37 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 May 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4311 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization with overdue penalties - Interest calculation: Default Behavior - Re-amortization with overdue penalties
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
When Admin sets the business date to "05 March 2024"
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "05 March 2024" due date and 5 EUR transaction amount
When Admin sets the business date to "10 March 2024"
When Admin adds "LOAN_NSF_FEE" due date charge with "10 March 2024" due date and 10 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.46 | 16.59 | 0.42 | 5.0 | 10.0 | 32.01 | 0.0 | 0.0 | 0.0 | 32.01 |
| 4 | 30 | 01 May 2024 | | 33.74 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.93 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.93 | 0.1 | 0.0 | 0.0 | 17.03 | 0.0 | 0.0 | 0.0 | 17.03 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.08 | 5.0 | 10.0 | 117.08 | 17.01 | 0.0 | 0.0 | 100.07 |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 5.0 | 10.0 | 36.32 | 0.0 | 0.0 | 0.0 | 36.32 |
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.3 | 5.0 | 10.0 | 117.3 | 17.01 | 0.0 | 0.0 | 100.29 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4312 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization with multiple unpaid installments - Interest calculation: Default Behavior - Re-amortization with multiple unpaid installments
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
When Admin sets the business date to "15 April 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 15 April 2024 | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 April 2024 | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | 15 April 2024 | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 4 | 30 | 01 May 2024 | | 68.01 | 31.99 | 2.32 | 0.0 | 0.0 | 34.31 | 0.0 | 0.0 | 0.0 | 34.31 |
| 5 | 31 | 01 June 2024 | | 34.1 | 33.91 | 0.4 | 0.0 | 0.0 | 34.31 | 0.0 | 0.0 | 0.0 | 34.31 |
| 6 | 30 | 01 July 2024 | | 0.0 | 34.1 | 0.2 | 0.0 | 0.0 | 34.3 | 0.0 | 0.0 | 0.0 | 34.3 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.92 | 0.0 | 0.0 | 102.92 | 0.0 | 0.0 | 0.0 | 102.92 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 15 April 2024 | Re-amortize | 51.03 | 49.29 | 1.74 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 April 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
@TestRailId:C4313 @AdvancedPaymentAllocation
Scenario: Verify Re-amortization after overpayment - Interest calculation: Default Behavior - Re-amortization after overpayment
When Admin sets the business date to "01 January 2024"
When Admin creates a client with random data
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
When Admin creates a fully customized loan with the following data:
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
When Admin sets the business date to "01 February 2024"
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 30.0 EUR transaction amount
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | | 66.97 | 16.6 | 0.41 | 0.0 | 0.0 | 17.01 | 12.99 | 12.99 | 0.0 | 4.02 |
| 3 | 31 | 01 April 2024 | | 50.35 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 4 | 30 | 01 May 2024 | | 33.63 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 5 | 31 | 01 June 2024 | | 16.82 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 16.82 | 0.1 | 0.0 | 0.0 | 16.92 | 0.0 | 0.0 | 0.0 | 16.92 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 1.97 | 0.0 | 0.0 | 101.97 | 30.0 | 12.99 | 0.0 | 71.97 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
When Admin sets the business date to "15 March 2024"
When When Admin creates a Loan re-amortization transaction on current business date
Then Loan Repayment schedule has 6 periods, with the following data for periods:
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
| 2 | 29 | 01 March 2024 | 15 March 2024 | 70.58 | 12.99 | 0.0 | 0.0 | 0.0 | 12.99 | 12.99 | 12.99 | 0.0 | 0.0 |
| 3 | 31 | 01 April 2024 | | 53.39 | 17.19 | 0.82 | 0.0 | 0.0 | 18.01 | 0.0 | 0.0 | 0.0 | 18.01 |
| 4 | 30 | 01 May 2024 | | 35.69 | 17.7 | 0.31 | 0.0 | 0.0 | 18.01 | 0.0 | 0.0 | 0.0 | 18.01 |
| 5 | 31 | 01 June 2024 | | 17.89 | 17.8 | 0.21 | 0.0 | 0.0 | 18.01 | 0.0 | 0.0 | 0.0 | 18.01 |
| 6 | 30 | 01 July 2024 | | 0.0 | 17.89 | 0.1 | 0.0 | 0.0 | 17.99 | 0.0 | 0.0 | 0.0 | 17.99 |
Then Loan Repayment schedule has the following data in Total row:
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
| 100.0 | 2.02 | 0.0 | 0.0 | 102.02 | 30.0 | 12.99 | 0.0 | 72.02 |
Then Loan Transactions tab has the following data:
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
| 01 February 2024 | Repayment | 30.0 | 29.42 | 0.58 | 0.0 | 0.0 | 70.58 | false | false |
| 15 March 2024 | Re-amortize | 4.02 | 3.61 | 0.41 | 0.0 | 0.0 | 0.0 | false | false |
When Loan Pay-off is made on "15 March 2024"
Then Loan is closed with zero outstanding balance and it's all installments have obligations met