FINERACT-2398: Re-amortization:- Interest handling-Default behavior
This commit is contained in:
committed by
Adam Saghy
parent
8391614330
commit
3c4d8da1c8
@@ -696,3 +696,409 @@ Feature: LoanReAmortization
|
||||
| 21 February 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 700.0 | false | false |
|
||||
| 21 February 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 675.0 | true | false |
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - UC1
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 17.01 | 0.0 | 0.0 | 85.04 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.3 | 0.0 | 0.0 | 102.3 | 17.01 | 0.0 | 0.0 | 85.29 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Principal and interest and Fees - UC2
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
When Admin sets the business date to "15 February 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 February 2024" due date and 10 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 10.0 | 0.0 | 27.01 | 0.0 | 0.0 | 0.0 | 27.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
And Loan Charges tab has the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| Snooze fee | false | Specified due date | 15 February 2024 | Flat | 10.0 | 0.0 | 0.0 | 10.0 |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 83.57 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
And Loan Charges tab has the following data:
|
||||
| Name | isPenalty | Payment due at | Due as of | Calculation type | Due | Paid | Waived | Outstanding |
|
||||
| Snooze fee | false | Specified due date | 15 February 2024 | Flat | 10.0 | 0.0 | 0.0 | 10.0 |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - N+1 Scenario - UC3
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
When Admin sets the business date to "15 July 2024"
|
||||
When Admin adds "LOAN_SNOOZE_FEE" due date charge with "15 July 2024" due date and 10 EUR transaction amount
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 10.0 | 0.0 | 112.05 | 17.01 | 0.0 | 0.0 | 95.04 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 15 March 2024 | 83.57 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 63.23 | 20.34 | 0.98 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 4 | 30 | 01 May 2024 | | 42.28 | 20.95 | 0.37 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 5 | 31 | 01 June 2024 | | 21.21 | 21.07 | 0.25 | 0.0 | 0.0 | 21.32 | 0.0 | 0.0 | 0.0 | 21.32 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 21.21 | 0.12 | 0.0 | 0.0 | 21.33 | 0.0 | 0.0 | 0.0 | 21.33 |
|
||||
| 7 | 14 | 15 July 2024 | | 0.0 | 0.0 | 0.0 | 10.0 | 0.0 | 10.0 | 0.0 | 0.0 | 0.0 | 10.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.3 | 10.0 | 0.0 | 112.3 | 17.01 | 0.0 | 0.0 | 95.29 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 17.01 | 16.52 | 0.49 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Charge-back before re-aging - UC4
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_PYMNT_INTEREST_DAILY_INTEREST_RECALC_EMI_360_30_CHARGEBACK_INTEREST_PENALTY_FEE_PRINCIPAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 17.01 EUR transaction amount
|
||||
When Admin makes "REPAYMENT_ADJUSTMENT_CHARGEBACK" chargeback with 17.01 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.14 | 32.86 | 1.16 | 0.0 | 0.0 | 34.02 | 0.0 | 0.0 | 0.0 | 34.02 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.52 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.8 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.99 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.99 | 0.1 | 0.0 | 0.0 | 17.09 | 0.0 | 0.0 | 0.0 | 17.09 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 116.43 | 2.72 | 0.0 | 0.0 | 119.15 | 17.01 | 0.0 | 0.0 | 102.14 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false |
|
||||
| 01 February 2024 | Chargeback | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 15 March 2024 | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 76.08 | 23.92 | 1.74 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
|
||||
| 4 | 30 | 01 May 2024 | | 50.86 | 25.22 | 0.44 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
|
||||
| 5 | 31 | 01 June 2024 | | 25.5 | 25.36 | 0.3 | 0.0 | 0.0 | 25.66 | 0.0 | 0.0 | 0.0 | 25.66 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 25.5 | 0.15 | 0.0 | 0.0 | 25.65 | 0.0 | 0.0 | 0.0 | 25.65 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 116.43 | 3.21 | 0.0 | 0.0 | 119.64 | 17.01 | 0.0 | 0.0 | 102.63 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 83.57 | false | false |
|
||||
| 01 February 2024 | Chargeback | 17.01 | 16.43 | 0.58 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 34.02 | 32.86 | 1.16 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - Partially paid installment - UC5
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_CUSTOM_PMT_ALLOC_PROGRESSIVE_LOAN_SCHEDULE_HORIZONTAL | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.05 | 16.52 | 0.49 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.43 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.71 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.9 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.9 | 0.1 | 0.0 | 0.0 | 17.0 | 0.0 | 0.0 | 0.0 | 17.0 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.05 | 0.0 | 0.0 | 102.05 | 0.0 | 0.0 | 0.0 | 102.05 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 20.0 EUR transaction amount
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | | 67.03 | 16.54 | 0.47 | 0.0 | 0.0 | 17.01 | 2.99 | 2.99 | 0.0 | 14.02 |
|
||||
| 3 | 31 | 01 April 2024 | | 50.41 | 16.62 | 0.39 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 4 | 30 | 01 May 2024 | | 33.69 | 16.72 | 0.29 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 5 | 31 | 01 June 2024 | | 16.88 | 16.81 | 0.2 | 0.0 | 0.0 | 17.01 | 0.0 | 0.0 | 0.0 | 17.01 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 16.88 | 0.1 | 0.0 | 0.0 | 16.98 | 0.0 | 0.0 | 0.0 | 16.98 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.03 | 0.0 | 0.0 | 102.03 | 20.0 | 2.99 | 0.0 | 82.03 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false |
|
||||
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 6 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 31 | 01 February 2024 | 01 February 2024 | 83.57 | 16.43 | 0.58 | 0.0 | 0.0 | 17.01 | 17.01 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 29 | 01 March 2024 | 15 March 2024 | 80.58 | 2.99 | 0.0 | 0.0 | 0.0 | 2.99 | 2.99 | 2.99 | 0.0 | 0.0 |
|
||||
| 3 | 31 | 01 April 2024 | | 60.96 | 19.62 | 0.94 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
|
||||
| 4 | 30 | 01 May 2024 | | 40.76 | 20.2 | 0.36 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
|
||||
| 5 | 31 | 01 June 2024 | | 20.44 | 20.32 | 0.24 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
|
||||
| 6 | 30 | 01 July 2024 | | 0.0 | 20.44 | 0.12 | 0.0 | 0.0 | 20.56 | 0.0 | 0.0 | 0.0 | 20.56 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 2.24 | 0.0 | 0.0 | 102.24 | 20.0 | 2.99 | 0.0 | 82.24 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 20.0 | 19.42 | 0.58 | 0.0 | 0.0 | 80.58 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 14.02 | 13.55 | 0.47 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
|
||||
Scenario: Verify allowing Re-amortization on interest bearing loan - Interest calculation: Default Behavior - DownPayment Scenarios - UC6
|
||||
When Admin sets the business date to "01 January 2024"
|
||||
When Admin creates a client with random data
|
||||
When Admin set "LP2_ADV_PYMNT_INTEREST_RECALCULATION_DAILY_EMI_360_30_MULTIDISBURSE_AUTO_DOWNPAYMENT" loan product "DEFAULT" transaction type to "NEXT_INSTALLMENT" future installment allocation rule
|
||||
When Admin creates a fully customized loan with the following data:
|
||||
| LoanProduct | submitted on date | with Principal | ANNUAL interest rate % | interest type | interest calculation period | amortization type | loanTermFrequency | loanTermFrequencyType | repaymentEvery | repaymentFrequencyType | numberOfRepayments | graceOnPrincipalPayment | graceOnInterestPayment | interest free period | Payment strategy |
|
||||
| LP2_ADV_PYMNT_INTEREST_RECALCULATION_DAILY_EMI_360_30_MULTIDISBURSE_AUTO_DOWNPAYMENT | 01 January 2024 | 100 | 7 | DECLINING_BALANCE | DAILY | EQUAL_INSTALLMENTS | 6 | MONTHS | 1 | MONTHS | 6 | 0 | 0 | 0 | ADVANCED_PAYMENT_ALLOCATION |
|
||||
And Admin successfully approves the loan on "01 January 2024" with "100" amount and expected disbursement date on "01 January 2024"
|
||||
When Admin successfully disburse the loan on "01 January 2024" with "100" EUR transaction amount
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 31 | 01 February 2024 | | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 25.0 | 0.0 | 0.0 | 76.54 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
|
||||
When Admin sets the business date to "01 February 2024"
|
||||
And Customer makes "AUTOPAY" repayment on "01 February 2024" with 12.76 EUR transaction amount
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 31 | 01 February 2024| 01 February 2024 | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 29 | 01 March 2024 | | 50.29 | 12.39 | 0.37 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 4 | 31 | 01 April 2024 | | 37.82 | 12.47 | 0.29 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 5 | 30 | 01 May 2024 | | 25.28 | 12.54 | 0.22 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 6 | 31 | 01 June 2024 | | 12.67 | 12.61 | 0.15 | 0.0 | 0.0 | 12.76 | 0.0 | 0.0 | 0.0 | 12.76 |
|
||||
| 7 | 30 | 01 July 2024 | | 0.0 | 12.67 | 0.07 | 0.0 | 0.0 | 12.74 | 0.0 | 0.0 | 0.0 | 12.74 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 1.54 | 0.0 | 0.0 | 101.54 | 37.76 | 0.0 | 0.0 | 63.78 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
|
||||
When Admin sets the business date to "15 March 2024"
|
||||
When When Admin creates a Loan re-amortization transaction on current business date
|
||||
Then Loan Repayment schedule has 7 periods, with the following data for periods:
|
||||
| Nr | Days | Date | Paid date | Balance of loan | Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| | | 01 January 2024 | | 100.0 | | | 0.0 | | 0.0 | 0.0 | | | |
|
||||
| 1 | 0 | 01 January 2024 | 01 January 2024 | 75.0 | 25.0 | 0.0 | 0.0 | 0.0 | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 2 | 31 | 01 February 2024 | 01 February 2024 | 62.68 | 12.32 | 0.44 | 0.0 | 0.0 | 12.76 | 12.76 | 0.0 | 0.0 | 0.0 |
|
||||
| 3 | 29 | 01 March 2024 | 15 March 2024 | 62.68 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
|
||||
| 4 | 31 | 01 April 2024 | | 47.43 | 15.25 | 0.74 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
|
||||
| 5 | 30 | 01 May 2024 | | 31.72 | 15.71 | 0.28 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
|
||||
| 6 | 31 | 01 June 2024 | | 15.92 | 15.8 | 0.19 | 0.0 | 0.0 | 15.99 | 0.0 | 0.0 | 0.0 | 15.99 |
|
||||
| 7 | 30 | 01 July 2024 | | 0.0 | 15.92 | 0.09 | 0.0 | 0.0 | 16.01 | 0.0 | 0.0 | 0.0 | 16.01 |
|
||||
Then Loan Repayment schedule has the following data in Total row:
|
||||
| Principal due | Interest | Fees | Penalties | Due | Paid | In advance | Late | Outstanding |
|
||||
| 100.0 | 1.74 | 0.0 | 0.0 | 101.74 | 37.76 | 0.0 | 0.0 | 63.98 |
|
||||
Then Loan Transactions tab has the following data:
|
||||
| Transaction date | Transaction Type | Amount | Principal | Interest | Fees | Penalties | Loan Balance | Reverted | Replayed |
|
||||
| 01 January 2024 | Disbursement | 100.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | false | false |
|
||||
| 01 January 2024 | Down Payment | 25.0 | 25.0 | 0.0 | 0.0 | 0.0 | 75.0 | false | false |
|
||||
| 01 February 2024 | Repayment | 12.76 | 12.32 | 0.44 | 0.0 | 0.0 | 62.68 | false | false |
|
||||
| 15 March 2024 | Re-amortize | 12.76 | 12.39 | 0.37 | 0.0 | 0.0 | 0.0 | false | false |
|
||||
|
||||
When Loan Pay-off is made on "15 March 2024"
|
||||
Then Loan is closed with zero outstanding balance and it's all installments have obligations met
|
||||
+71
-8
@@ -96,6 +96,7 @@ import org.apache.fineract.portfolio.loanaccount.domain.LoanTransactionToRepayme
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.SingleLoanChargeRepaymentScheduleProcessingWrapper;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.reaging.LoanReAgeInterestHandlingType;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.reaging.LoanReAgeParameter;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.reamortization.LoanReAmortizationParameter;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.AbstractLoanRepaymentScheduleTransactionProcessor;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.MoneyHolder;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.TransactionCtx;
|
||||
@@ -590,6 +591,42 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
}
|
||||
|
||||
private void handleReAmortization(LoanTransaction loanTransaction, TransactionCtx transactionCtx) {
|
||||
final Loan loan = loanTransaction.getLoan();
|
||||
final LoanReAmortizationParameter loanReAmortizationParameter = loanTransaction.getLoanReAmortizationParameter();
|
||||
if (loan.isInterestBearing()) {
|
||||
switch (loanReAmortizationParameter.getInterestHandlingType()) {
|
||||
case DEFAULT -> handleReamortizationWithDefaultInterestHandlingType(loanTransaction, transactionCtx);
|
||||
case WAIVE_INTEREST -> handleReamortizationWithWaiveInterestHandlingType(loanTransaction, transactionCtx);
|
||||
case EQUAL_AMORTIZATION_INTEREST_SPLIT ->
|
||||
handleReamortizationWithEqualAmortizationInterestSplitHandlingType(loanTransaction, transactionCtx);
|
||||
}
|
||||
} else {
|
||||
reamortizationOnNonInterestBearingLoan(loanTransaction, transactionCtx);
|
||||
}
|
||||
}
|
||||
|
||||
private void handleReamortizationWithEqualAmortizationInterestSplitHandlingType(LoanTransaction loanTransaction,
|
||||
TransactionCtx transactionCtx) {
|
||||
throw new UnsupportedOperationException(
|
||||
"EQUAL_AMORTIZATION_INTEREST_SPLIT interest handling strategy for re-amortization is not implemented");
|
||||
}
|
||||
|
||||
private void handleReamortizationWithWaiveInterestHandlingType(LoanTransaction loanTransaction, TransactionCtx transactionCtx) {
|
||||
throw new UnsupportedOperationException("WAIVE_INTEREST interest handling strategy for re-amortization is not implemented");
|
||||
}
|
||||
|
||||
private void handleReamortizationWithDefaultInterestHandlingType(LoanTransaction loanTransaction, TransactionCtx transactionCtx) {
|
||||
// re-amortization logic for interest-bearing loans
|
||||
if (transactionCtx instanceof ProgressiveTransactionCtx progressiveTransactionCtx
|
||||
&& loanTransaction.getLoan().isInterestBearingAndInterestRecalculationEnabled()) {
|
||||
handleReAmortizationWithInterestRecalculationEnabled(loanTransaction, progressiveTransactionCtx);
|
||||
}
|
||||
// TODO: implement interestRecalculation = false logic
|
||||
throw new UnsupportedOperationException(
|
||||
"Logic for re-amortization when interest bearing loan has interestRecalculation disabled is not implemented");
|
||||
}
|
||||
|
||||
private static void reamortizationOnNonInterestBearingLoan(LoanTransaction loanTransaction, TransactionCtx transactionCtx) {
|
||||
LocalDate transactionDate = loanTransaction.getTransactionDate();
|
||||
List<LoanRepaymentScheduleInstallment> previousInstallments = transactionCtx.getInstallments().stream() //
|
||||
.filter(installment -> !installment.getDueDate().isAfter(transactionDate)) //
|
||||
@@ -634,6 +671,32 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
}
|
||||
}
|
||||
|
||||
private void handleReAmortizationWithInterestRecalculationEnabled(final LoanTransaction loanTransaction,
|
||||
final ProgressiveTransactionCtx ctx) {
|
||||
final LocalDate transactionDate = loanTransaction.getTransactionDate();
|
||||
final MonetaryCurrency currency = ctx.getCurrency();
|
||||
|
||||
final List<LoanRepaymentScheduleInstallment> previousInstallments = ctx.getInstallments().stream() //
|
||||
.filter(installment -> !installment.getDueDate().isAfter(transactionDate)) //
|
||||
.toList();
|
||||
|
||||
Money totalOverDuePrincipal = Money.zero(currency);
|
||||
for (LoanRepaymentScheduleInstallment installment : previousInstallments) {
|
||||
final Money principalCompleted = installment.getPrincipalCompleted(currency);
|
||||
totalOverDuePrincipal = totalOverDuePrincipal.add(installment.getPrincipal(currency).minus(principalCompleted));
|
||||
}
|
||||
|
||||
final Money totalOverDueInterest = emiCalculator.getOutstandingInterestTillDate(ctx.getModel(),
|
||||
previousInstallments.getLast().getDueDate());
|
||||
|
||||
loanTransaction.resetDerivedComponents();
|
||||
loanTransaction.updateComponentsAndTotal(totalOverDuePrincipal, totalOverDueInterest, Money.zero(currency), Money.zero(currency));
|
||||
|
||||
// Update the existing model with re-amortized periods
|
||||
emiCalculator.updateModelRepaymentPeriodsDuringReAmortization(ctx.getModel(), transactionDate);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, ctx);
|
||||
}
|
||||
|
||||
@Override
|
||||
protected void handleChargeback(LoanTransaction loanTransaction, TransactionCtx ctx) {
|
||||
processCreditTransaction(loanTransaction, ctx);
|
||||
@@ -671,12 +734,12 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
if (!currentInstallment.isAdditional() && DateUtils.isAfter(currentInstallment.getDueDate(), transactionDate)) {
|
||||
|
||||
emiCalculator.creditPrincipal(model, transactionDate, transactionAmount);
|
||||
updateRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
|
||||
if (repaidAmount.isGreaterThanZero()) {
|
||||
emiCalculator.payPrincipal(model, currentInstallment.getFromDate(), currentInstallment.getDueDate(),
|
||||
transactionDate, repaidAmount);
|
||||
updateRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
currentInstallment.payPrincipalComponent(transactionDate, repaidAmount);
|
||||
transactionMappings.add(LoanTransactionToRepaymentScheduleMapping.createFrom(loanTransaction,
|
||||
currentInstallment, repaidAmount, zeroMoney, zeroMoney, zeroMoney));
|
||||
@@ -709,12 +772,12 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
LoanRepaymentScheduleInstallment currentInstallment = installmentToBeProcessed.getLast();
|
||||
|
||||
emiCalculator.creditPrincipal(model, transactionDate, transactionAmount);
|
||||
updateRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
|
||||
if (repaidAmount.isGreaterThanZero()) {
|
||||
emiCalculator.payPrincipal(model, currentInstallment.getFromDate(), currentInstallment.getDueDate(),
|
||||
transactionDate, repaidAmount);
|
||||
updateRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, progressiveTransactionCtx);
|
||||
currentInstallment.payPrincipalComponent(transactionDate, repaidAmount);
|
||||
transactionMappings.add(LoanTransactionToRepaymentScheduleMapping.createFrom(loanTransaction,
|
||||
currentInstallment, repaidAmount, zeroMoney, zeroMoney, zeroMoney));
|
||||
@@ -866,7 +929,7 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
}
|
||||
|
||||
// update repayment periods until maturity date, for principal and interest portions
|
||||
updateRepaymentPeriods(loanTransaction, ctx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, ctx);
|
||||
|
||||
// search last instalment if transaction is posted on last installment's due date
|
||||
// otherwise search installment where transaction date is in from date (inclusive) to due date (exclusive)
|
||||
@@ -2589,15 +2652,15 @@ public class AdvancedPaymentScheduleTransactionProcessor extends AbstractLoanRep
|
||||
|
||||
if (PRINCIPAL.equals(paymentAllocationType.getAllocationType())) {
|
||||
emiCalculator.payPrincipal(model, installment.getFromDate(), installment.getDueDate(), payDate, paidPortion);
|
||||
updateRepaymentPeriods(loanTransaction, ctx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, ctx);
|
||||
} else if (INTEREST.equals(paymentAllocationType.getAllocationType())) {
|
||||
emiCalculator.payInterest(model, installment.getFromDate(), installment.getDueDate(), payDate, paidPortion);
|
||||
updateRepaymentPeriods(loanTransaction, ctx);
|
||||
updateInstallmentsByRepaymentPeriods(loanTransaction, ctx);
|
||||
}
|
||||
return paidPortion;
|
||||
}
|
||||
|
||||
private void updateRepaymentPeriods(LoanTransaction loanTransaction, ProgressiveTransactionCtx ctx) {
|
||||
private void updateInstallmentsByRepaymentPeriods(LoanTransaction loanTransaction, ProgressiveTransactionCtx ctx) {
|
||||
ctx.getModel().repaymentPeriods().forEach(rm -> {
|
||||
LoanRepaymentScheduleInstallment installment = ctx.getInstallments().stream().filter(
|
||||
ri -> ri.getFromDate().equals(rm.getFromDate()) && ri.getDueDate().equals(rm.getDueDate()) && !ri.isDownPayment())
|
||||
|
||||
+2
@@ -170,4 +170,6 @@ public interface EMICalculator {
|
||||
|
||||
void changeDueDate(ProgressiveLoanInterestScheduleModel scheduleModel, LoanApplicationTerms loanApplicationTerms,
|
||||
LocalDate targetRepaymentPeriodDueDate, LocalDate newDueDate);
|
||||
|
||||
void updateModelRepaymentPeriodsDuringReAmortization(ProgressiveLoanInterestScheduleModel model, LocalDate transactionDate);
|
||||
}
|
||||
|
||||
+21
-9
@@ -570,7 +570,7 @@ public final class ProgressiveEMICalculator implements EMICalculator {
|
||||
public void updateModelRepaymentPeriodsDuringReAge(final ProgressiveLoanInterestScheduleModel scheduleModel,
|
||||
final LocalDate reAgePeriodStartDate, final LocalDate reAgeFirstDueDate, final LocalDate targetDate,
|
||||
final LoanApplicationTerms loanApplicationTerms, final MathContext mc) {
|
||||
moveOutstandingAmountsFromPeriodsBeforeReAging(scheduleModel.repaymentPeriods(), targetDate);
|
||||
moveOutstandingAmountsFromPeriodsBeforeTransactionDate(scheduleModel.repaymentPeriods(), targetDate);
|
||||
|
||||
// calculate already paid balances from transaction date
|
||||
final OutstandingDetails paidBalancesFromTransactionDate = calculatePaidBalancesAfterDate(scheduleModel, targetDate);
|
||||
@@ -673,6 +673,18 @@ public final class ProgressiveEMICalculator implements EMICalculator {
|
||||
calculateLastUnpaidRepaymentPeriodEMI(scheduleModel, targetRepaymentPeriodDueDate);
|
||||
}
|
||||
|
||||
@Override
|
||||
public void updateModelRepaymentPeriodsDuringReAmortization(final ProgressiveLoanInterestScheduleModel model,
|
||||
final LocalDate transactionDate) {
|
||||
moveOutstandingAmountsFromPeriodsBeforeTransactionDate(model.repaymentPeriods(), transactionDate);
|
||||
final List<RepaymentPeriod> reAmortizedPeriods = model.repaymentPeriods().stream()
|
||||
.filter(rp -> rp.getDueDate().isAfter(transactionDate)).toList();
|
||||
calculateEMIOnActualModel(reAmortizedPeriods, model);
|
||||
calculateOutstandingBalance(model);
|
||||
calculateLastUnpaidRepaymentPeriodEMI(model, transactionDate);
|
||||
checkAndAdjustEmiIfNeededOnRelatedRepaymentPeriods(model, reAmortizedPeriods);
|
||||
}
|
||||
|
||||
private LocalDate calculateDateForFixedLength(final ProgressiveLoanInterestScheduleModel scheduleModel,
|
||||
final LoanApplicationTerms loanApplicationTerms, final LocalDate targetRepaymentPeriodDueDate, final LocalDate newDueDate) {
|
||||
final long variationDays = DateUtils.getDifferenceInDays(targetRepaymentPeriodDueDate, newDueDate);
|
||||
@@ -825,16 +837,16 @@ public final class ProgressiveEMICalculator implements EMICalculator {
|
||||
}
|
||||
|
||||
/**
|
||||
* * Zeroing out the EMI of the repayment periods, that are before re-aging and not been fully paid. And decreases
|
||||
* the balance correction amount (added during interest recalculation for the business date) by the amount of the
|
||||
* principal that was moved.
|
||||
* * Zeroing out the EMI of the repayment periods, that are before the transaction date and not been fully paid. And
|
||||
* decreases the balance correction amount (added during interest recalculation for the business date) by the amount
|
||||
* of the principal that was moved.
|
||||
*/
|
||||
private static void moveOutstandingAmountsFromPeriodsBeforeReAging(final List<RepaymentPeriod> existingRepaymentPeriods,
|
||||
private static void moveOutstandingAmountsFromPeriodsBeforeTransactionDate(final List<RepaymentPeriod> existingRepaymentPeriods,
|
||||
final LocalDate transactionDate) {
|
||||
final List<RepaymentPeriod> periodsBeforeReAging = existingRepaymentPeriods.stream()
|
||||
final List<RepaymentPeriod> periodsBeforeTransactionDate = existingRepaymentPeriods.stream()
|
||||
.filter(rp -> !rp.getFromDate().isAfter(transactionDate) && !rp.isFullyPaid()).toList();
|
||||
|
||||
periodsBeforeReAging.forEach(rp -> {
|
||||
periodsBeforeTransactionDate.forEach(rp -> {
|
||||
rp.getInterestPeriods().stream().filter(ip -> ip.getDueDate().isEqual(transactionDate)).forEach(ip -> {
|
||||
if (!ip.getBalanceCorrectionAmount().isZero()) {
|
||||
ip.addBalanceCorrectionAmount(ip.getBalanceCorrectionAmount().negated());
|
||||
@@ -845,7 +857,7 @@ public final class ProgressiveEMICalculator implements EMICalculator {
|
||||
lastInterestPeriod.addBalanceCorrectionAmount(rp.getOutstandingPrincipal().negated());
|
||||
}
|
||||
rp.setEmi(rp.getTotalPaidAmount());
|
||||
rp.setOutstandingMovedDueToReAging(true);
|
||||
rp.setOutstandingMoved(true);
|
||||
});
|
||||
}
|
||||
|
||||
@@ -1725,7 +1737,7 @@ public final class ProgressiveEMICalculator implements EMICalculator {
|
||||
rp.getInterestPeriods().getLast()
|
||||
.addCreditedInterestAmount(MathUtil.min(rp.getOutstandingInterest(), rp.getCreditedInterest(), false).negated());
|
||||
rp.setEmi(rp.getTotalPaidAmount());
|
||||
rp.setOutstandingMovedDueToReAging(true);
|
||||
rp.setOutstandingMoved(true);
|
||||
});
|
||||
|
||||
// stop calculate unrecognised interest at this point because all
|
||||
|
||||
+4
-5
@@ -91,7 +91,7 @@ public class RepaymentPeriod {
|
||||
|
||||
@Getter
|
||||
@Setter
|
||||
private boolean isOutstandingMovedDueToReAging = false;
|
||||
private boolean isOutstandingMoved = false;
|
||||
|
||||
@Setter
|
||||
@Getter
|
||||
@@ -148,7 +148,7 @@ public class RepaymentPeriod {
|
||||
repaymentPeriod.getPaidPrincipal(), repaymentPeriod.getPaidInterest(), repaymentPeriod.getFutureUnrecognizedInterest(), mc,
|
||||
repaymentPeriod.getLoanProductRelatedDetail(), repaymentPeriod.isNoUnrecognisedInterest(), repaymentPeriod.isReAged(),
|
||||
repaymentPeriod.isReAgedEarlyRepaymentHolder(), repaymentPeriod.getReAgedInterest());
|
||||
newRepaymentPeriod.setOutstandingMovedDueToReAging(repaymentPeriod.isOutstandingMovedDueToReAging());
|
||||
newRepaymentPeriod.setOutstandingMoved(repaymentPeriod.isOutstandingMoved());
|
||||
// There is always at least 1 interest period, by default with same from-due date as repayment period
|
||||
for (InterestPeriod interestPeriod : repaymentPeriod.getInterestPeriods()) {
|
||||
newRepaymentPeriod.getInterestPeriods().add(InterestPeriod.copy(newRepaymentPeriod, interestPeriod, mc));
|
||||
@@ -162,7 +162,7 @@ public class RepaymentPeriod {
|
||||
repaymentPeriod.getDueDate(), new ArrayList<>(), repaymentPeriod.getEmi(), repaymentPeriod.getOriginalEmi(), zero, zero,
|
||||
zero, mc, repaymentPeriod.getLoanProductRelatedDetail(), repaymentPeriod.isNoUnrecognisedInterest(),
|
||||
repaymentPeriod.isReAged(), repaymentPeriod.isReAgedEarlyRepaymentHolder(), repaymentPeriod.getReAgedInterest());
|
||||
newRepaymentPeriod.setOutstandingMovedDueToReAging(repaymentPeriod.isOutstandingMovedDueToReAging());
|
||||
newRepaymentPeriod.setOutstandingMoved(repaymentPeriod.isOutstandingMoved());
|
||||
// There is always at least 1 interest period, by default with same from-due date as repayment period
|
||||
for (InterestPeriod interestPeriod : repaymentPeriod.getInterestPeriods()) {
|
||||
var interestPeriodCopy = InterestPeriod.copy(newRepaymentPeriod, interestPeriod);
|
||||
@@ -311,8 +311,7 @@ public class RepaymentPeriod {
|
||||
* @return
|
||||
*/
|
||||
public Money getTotalCreditedAmount() {
|
||||
return isOutstandingMovedDueToReAging ? Money.zero(getCurrency(), getMc())
|
||||
: getCreditedPrincipal().plus(getCreditedInterest(), getMc());
|
||||
return isOutstandingMoved ? Money.zero(getCurrency(), getMc()) : getCreditedPrincipal().plus(getCreditedInterest(), getMc());
|
||||
}
|
||||
|
||||
/**
|
||||
|
||||
+2
-2
@@ -24,7 +24,7 @@ import org.apache.fineract.commands.handler.NewCommandSourceHandler;
|
||||
import org.apache.fineract.infrastructure.DataIntegrityErrorHandler;
|
||||
import org.apache.fineract.infrastructure.core.api.JsonCommand;
|
||||
import org.apache.fineract.infrastructure.core.data.CommandProcessingResult;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.reamortization.LoanReAmortizationServiceImpl;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.reamortization.LoanReAmortizationService;
|
||||
import org.springframework.dao.DataIntegrityViolationException;
|
||||
import org.springframework.orm.jpa.JpaSystemException;
|
||||
import org.springframework.stereotype.Service;
|
||||
@@ -34,7 +34,7 @@ import org.springframework.stereotype.Service;
|
||||
@CommandType(entity = "LOAN", action = "REAMORTIZE")
|
||||
public class LoanReAmortizationCommandHandler implements NewCommandSourceHandler {
|
||||
|
||||
private final LoanReAmortizationServiceImpl loanReAmortizationService;
|
||||
private final LoanReAmortizationService loanReAmortizationService;
|
||||
private final DataIntegrityErrorHandler dataIntegrityErrorHandler;
|
||||
|
||||
@Override
|
||||
|
||||
+2
-2
@@ -24,7 +24,7 @@ import org.apache.fineract.commands.handler.NewCommandSourceHandler;
|
||||
import org.apache.fineract.infrastructure.DataIntegrityErrorHandler;
|
||||
import org.apache.fineract.infrastructure.core.api.JsonCommand;
|
||||
import org.apache.fineract.infrastructure.core.data.CommandProcessingResult;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.reamortization.LoanReAmortizationServiceImpl;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.reamortization.LoanReAmortizationService;
|
||||
import org.springframework.dao.DataIntegrityViolationException;
|
||||
import org.springframework.orm.jpa.JpaSystemException;
|
||||
import org.springframework.stereotype.Service;
|
||||
@@ -34,7 +34,7 @@ import org.springframework.stereotype.Service;
|
||||
@CommandType(entity = "LOAN", action = "UNDO_REAMORTIZE")
|
||||
public class LoanUndoReAmortizationCommandHandler implements NewCommandSourceHandler {
|
||||
|
||||
private final LoanReAmortizationServiceImpl loanReAmortizationService;
|
||||
private final LoanReAmortizationService loanReAmortizationService;
|
||||
private final DataIntegrityErrorHandler dataIntegrityErrorHandler;
|
||||
|
||||
@Override
|
||||
|
||||
+24
-20
@@ -24,6 +24,7 @@ import java.math.BigDecimal;
|
||||
import java.time.LocalDate;
|
||||
import java.util.Comparator;
|
||||
import java.util.LinkedHashMap;
|
||||
import java.util.List;
|
||||
import java.util.Map;
|
||||
import lombok.RequiredArgsConstructor;
|
||||
import org.apache.fineract.infrastructure.codes.domain.CodeValue;
|
||||
@@ -43,17 +44,14 @@ import org.apache.fineract.organisation.monetary.domain.Money;
|
||||
import org.apache.fineract.portfolio.loanaccount.api.LoanApiConstants;
|
||||
import org.apache.fineract.portfolio.loanaccount.api.LoanReAmortizationApiConstants;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.Loan;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.LoanRepaymentScheduleTransactionProcessorFactory;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.LoanTransaction;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.LoanTransactionRepository;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.LoanTransactionType;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.reamortization.LoanReAmortizationInterestHandlingType;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.reamortization.LoanReAmortizationParameter;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.LoanRepaymentScheduleTransactionProcessor;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.MoneyHolder;
|
||||
import org.apache.fineract.portfolio.loanaccount.domain.transactionprocessor.TransactionCtx;
|
||||
import org.apache.fineract.portfolio.loanaccount.serialization.LoanChargeValidator;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.LoanAssembler;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.LoanScheduleService;
|
||||
import org.apache.fineract.portfolio.loanaccount.service.ReprocessLoanTransactionsService;
|
||||
import org.springframework.stereotype.Service;
|
||||
import org.springframework.transaction.annotation.Transactional;
|
||||
@@ -61,37 +59,31 @@ import org.springframework.transaction.annotation.Transactional;
|
||||
@Service
|
||||
@RequiredArgsConstructor
|
||||
@Transactional
|
||||
public class LoanReAmortizationServiceImpl {
|
||||
public class LoanReAmortizationService {
|
||||
|
||||
private final LoanAssembler loanAssembler;
|
||||
private final LoanReAmortizationValidator reAmortizationValidator;
|
||||
private final ExternalIdFactory externalIdFactory;
|
||||
private final BusinessEventNotifierService businessEventNotifierService;
|
||||
private final LoanTransactionRepository loanTransactionRepository;
|
||||
private final LoanRepaymentScheduleTransactionProcessorFactory loanRepaymentScheduleTransactionProcessorFactory;
|
||||
private final LoanChargeValidator loanChargeValidator;
|
||||
private final ReprocessLoanTransactionsService reprocessLoanTransactionsService;
|
||||
private final CodeValueRepository codeValueRepository;
|
||||
private final LoanScheduleService loanScheduleService;
|
||||
|
||||
public CommandProcessingResult reAmortize(Long loanId, JsonCommand command) {
|
||||
Loan loan = loanAssembler.assembleFrom(loanId);
|
||||
public CommandProcessingResult reAmortize(final Long loanId, final JsonCommand command) {
|
||||
final Loan loan = loanAssembler.assembleFrom(loanId);
|
||||
reAmortizationValidator.validateReAmortize(loan, command);
|
||||
|
||||
Map<String, Object> changes = new LinkedHashMap<>();
|
||||
final LoanTransaction reAmortizeTransaction = createReAmortizeTransaction(loan, command);
|
||||
reAmortizeTransaction.setLoanReAmortizationParameter(createReAmortizationParameter(reAmortizeTransaction, command));
|
||||
processReAmortizationTransaction(loan, reAmortizeTransaction);
|
||||
loanTransactionRepository.saveAndFlush(reAmortizeTransaction);
|
||||
|
||||
final Map<String, Object> changes = new LinkedHashMap<>();
|
||||
changes.put(LoanReAmortizationApiConstants.localeParameterName, command.locale());
|
||||
changes.put(LoanReAmortizationApiConstants.dateFormatParameterName, command.dateFormat());
|
||||
|
||||
LoanTransaction reAmortizeTransaction = createReAmortizeTransaction(loan, command);
|
||||
|
||||
final LoanRepaymentScheduleTransactionProcessor loanRepaymentScheduleTransactionProcessor = loanRepaymentScheduleTransactionProcessorFactory
|
||||
.determineProcessor(loan.transactionProcessingStrategy());
|
||||
loanRepaymentScheduleTransactionProcessor.processLatestTransaction(reAmortizeTransaction, new TransactionCtx(loan.getCurrency(),
|
||||
loan.getRepaymentScheduleInstallments(), loan.getActiveCharges(), new MoneyHolder(loan.getTotalOverpaidAsMoney()), null));
|
||||
|
||||
reAmortizeTransaction.setLoanReAmortizationParameter(createReAmortizationParameter(reAmortizeTransaction, command));
|
||||
|
||||
loanTransactionRepository.saveAndFlush(reAmortizeTransaction);
|
||||
|
||||
// delinquency recalculation will be triggered by the event in a decoupled way via a listener
|
||||
businessEventNotifierService.notifyPostBusinessEvent(new LoanReAmortizeBusinessEvent(loan));
|
||||
businessEventNotifierService.notifyPostBusinessEvent(new LoanReAmortizeTransactionBusinessEvent(reAmortizeTransaction));
|
||||
@@ -118,6 +110,9 @@ public class LoanReAmortizationServiceImpl {
|
||||
if (reAmortizeTransaction == null) {
|
||||
// TODO: when validations implemented; throw exception if there isn't a reamortize transaction available
|
||||
}
|
||||
if (loan.isProgressiveSchedule()) {
|
||||
loanScheduleService.regenerateRepaymentSchedule(loan);
|
||||
}
|
||||
reverseReAmortizeTransaction(reAmortizeTransaction, command);
|
||||
loanTransactionRepository.saveAndFlush(reAmortizeTransaction);
|
||||
|
||||
@@ -183,4 +178,13 @@ public class LoanReAmortizationServiceImpl {
|
||||
|
||||
return new LoanReAmortizationParameter(reAmortizationTransaction, reAmortizationInterestHandlingType, reasonCodeValue);
|
||||
}
|
||||
|
||||
private void processReAmortizationTransaction(final Loan loan, final LoanTransaction reAmortizationTransaction) {
|
||||
if (loan.isInterestBearingAndInterestRecalculationEnabled()) {
|
||||
loanScheduleService.regenerateRepaymentSchedule(loan);
|
||||
reprocessLoanTransactionsService.reprocessTransactions(loan, List.of(reAmortizationTransaction));
|
||||
} else {
|
||||
reprocessLoanTransactionsService.processLatestTransaction(reAmortizationTransaction, loan);
|
||||
}
|
||||
}
|
||||
}
|
||||
Reference in New Issue
Block a user